HIGHLIGHTS
Recently completed airborne LiDAR survey at Bohier shows several
outcropping areas with LCT pegmatite characteristics.
Detailed analysis of the high-resolution air photos confirmed the area
is underexplored with less than 5% of the visible outcrop previously
mapped or sampled.
Helicopter supported lithium exploration/prospecting program to
commence at Bohier and Eastmain Léran Projects now access is
allowed following Quebec Ministry wildfire safety measures.
The program aims to identify outcropping, collect grab samples and
carry out detailed mapping along the greenstone belt targeting
Lithium, Caesium, Tantalum (LCT) pegmatites from the Wahemen
granite formations.
Eastmain Léran initial drilling results received from the spring 2023
exploration program.
Mont Royal Resources Limited (“Mont Royal”, the “Company”) (ASX:MRZ) is
pleased to announce that a two phase exploration program will commence at
the Northern Lights Projects in the Upper Eastmain Greenstone Belt located in
Quebec, Canada.
CORPORATE DIRECTORY
Gary Lawler
Non-Executive Chairman
Peter Ruse
Fig. 1: The upper Eastmain Greenstone Belt with Northern Lights Tenure, Eastmain Léran (Focus Graphite)
and Dios optioned tenure
1
Mont Royal Executive Director, Pete Ruse, commented: “The Company is encouraged by the detailed
analysis of the data sourced from the LIDAR survey completed in May 2023, which will assist greatly in
expediting the field prospection program. Coupled with anomalous soil samples in the down ice direction
and within the Greenstone Belt, the historical data compilation has developed numerous targets over a
10km strike length that have never been explored for lithium. We expect to return to the field in the very
near term as the James Bay region re-opens for exploration, as service providers (helicopter, contractors)
are being released back to the mining/exploration sector after carrying out firefighting efforts throughout
June and July.”
Completed LiDAR and Orthophoto Survey
LiDAR has many uses, and is particularly valuable for showing subtle variations in relief or elevation
on the ground. The LiDAR Survey at Bohier (Fig. 2) was completed by Mosaic 3D during late May
2023 covering a 91.6 km2 area. A density of 6-8 pts/m2 enabled the production of a digital elevation
model (DEM) with a 1m/pixel resolution and a vertical accuracy between 5 and 30 cm depending
on the substrate (e.g., more precise for hard surface and less precise for vegetated areas).
Image: Geological map overlaid with results from LiDAR Survey analysis at Bohier Project
The DEM is accompanied by a series of 131 orthophoto with a resolution of 8 cm/pixel. These
parameters enable the recognition of light-coloured outcrops with a positive relief (Fig. 3), which is
typical of white and more resistant pegmatites. Close examination of the photo suggests the
2
presence of pegmatite dykes frequent along more than 10 km in the volcanic and sedimentary
rocks. This interpretation will help the field crew to focus on the most prospective areas facilitating
accuracy and efficiency when working in the field in the near term.
Summer 2023 Surface Exploration Program
The summer 2023 surface exploration program will include prospecting, rock sampling, and
geological mapping, using the data that was delivered from the property-scale LiDAR and
orthophoto survey. This program will be led by the IOS Services Geoscientifiques technical team.
The clear objective of the surface program at Bohier is to evaluate the dolent mafic volcanics, the
same geological package that hosts neighbouring Benz Mining’s Ruby Hill pegmatites, and the
adjacent Bohier metasedimentary rocks. The geological mapping and rock sampling will be used to
delineate drill targets and to commence an immediate drilling program to follow up observations
and data from the field.
Following the work at Bohier, the field crew will proceed to a mapping and sampling program at the
Eastmain Léran Project (Fig 4), which is a favourable lithium target due to the proximity, to the
north, of the Wahemen granite which has the chemistry and mineralogy of a LCT pegmatite
parental granite (Talla Takam and Beauchamp, 2016). The pegmatites are unlikely to be found in
the granite itself but in the mafic volcanics a few kilometres from the greenstone – granite contact.
The objective is to find and sample granite and pegmatites outcrops and use their chemistry, for
vectoring. Areas with greater potential have already been identified by the presence of tantalum
minerals in a 2017 till survey and the presence of spodumene-bearing boulder in a 2016
government-led mapping program.
Bohier
33 Carats
(Dios)
Fig 2: Bohier Project showing the same volcanic rock package (light green) proven to host pegmatite to the west.
Source: IOS Geoscienfiques
3
Fig 3: Example of potential pegmatite outcrop as determined by air phot and LiDAR interpretation.
The exposure is 25m long and less than 5m wide.
Fig 4: Eastmain Léran including additional northern claims with Li exploration potential along the Wahemen Granite
Source: IOS Geoscienfiques
4
Eastmain Léran Drilling Program
In April 2023, the Company completed diamond drilling program of 4 holes targeting potential
copper & gold extensions to historical exploration in the 1950’s and 1970’s. The program consisted
of approximately 1,000m of drilling.
Although the intersected copper grades are underwhelming, the targeted volcanoclastic rocks are
clearly anomalous. The sulphides and grades distribution show an increase in copper content at
depth toward the ESE. To the SW, hole ALT-23-06 is barren but a soil anomaly indicates that either
the hole went below a shallow copper zone or that there is an inflexion in the mineralized zone and
that it is located south of the hole. The mineralization remains open at depth and further analysis
may open up potential for a second phase of drilling coupled with borehole EM to confirm the
geometry of the copper anomalous zone, and identify potential high-grade zones.
Table below summaries the result received in-excess of a 0.4% Cu cut off.
Hole Id
ALT-23-01
ALT-23-02
ALT-23-03
ALT-23-04
From (m)
To (m)
Length (m)
Cu (%)
94.65
95.75
1.10
0.547
95.75
96.8
1.05
0.0371
97.85
98.35
0.50
0.65
124.3
125.1
0.80
0.508
137.3
138
0.70
0.542
106.9
107.9
1.00
0.708
117.45
118.35
0.90
1.67
123.4
124.4
1.00
0.455
124.75
125.55
0.80
0.441
125.55
126.3
0.75
0.225
126.3
127.35
1.05
1.36
134.95
135.55
0.60
0.801
136.25
137.25
1.00
0.423
139.9
140.65
0.75
0.855
140.65
141.5
0.85
0.416
151.2
151.4
0.20
0.542
Aggregated interval
0.26% Cu / 3.7m
0.61% Cu / 3.95m
0.29% Cu / 6.55m
5
Fig 5: Drill collar information from the Eastmain Leran drilling program
Update on fires affecting regional Quebec
During June, the James Bay region of Quebec was subject to an emergency fire evacuation order
from the Ministry of Natural Resources and Forests. Due to the high-risk fire conditions during
June in the region, along with active fires elsewhere in the province, the ministry mandated that all
activities in the regions’ forests cease immediately, including mineral exploration, and that all
personnel be evacuated. Therefore, following the notice, the Company temporarily suspended its
exploration activities at Bohier and Eastmain Léran and evacuated its field crews without incident.
Pleasingly the Company was able to successfully complete its LiDAR survey ahead of this event,
with approximately four days of fieldwork before the evacuation. The Company is now set to return
to the fieldwork as soon as the key service providers return to normal business following the
firefighting effort.
6
The Company looks forward to embarking on its summer 2023 exploration program and will keep
shareholders informed with updates as soon as they become available.
ENDS.
For and on Behalf of the Board
Shaun Menezes | Company Secretary
For Further Information:
Peter Ruse
Jane Morgan
Executive Director
Investor and Media Relations
info@montroyalres.com
+61 405 555 618
jm@janemorganmanagement.com.au
About Mont Royal Resources
Mont Royal Resources Limited (ASX:MRZ) is an Australian company incorporated for the purpose
of pursuing various mining opportunities in the resources sector, with the aim of building
shareholder value by acquiring, exploring, evaluating and exploiting mineral resource project
opportunities.
Mont Royal acquired 75% of Northern Lights Minerals 536 km2 tenement package located in the
Upper Eastmain Greenstone belt - the projects are located in the emerging James Bay area, a tier 1
mining jurisdiction of Quebec, Canada, and are prospective for lithium, precious (Gold, Silver) and
base metals mineralisation (Copper, Nickel),
The Company has a binding JV option agreement with Azimut Exploration Inc. (TSXV: AZM), to earnin up to 70% of the Wapatik Gold-Copper Nickel Project. Furthermore, For further information
regarding Mont Royal Resources Limited, please visit the ASX platform (ASX:MRZ) or the
Company’s website www.montroyalres.com
Competent Person’s Statement
The information in this report that relates to exploration results is based on information compiled by Mr Hugues Longuépée, a Competent
Person who is a Member of the Ordre des Géologues du Québec. Mr Longuépée is a consultant to the Company. Mr Longuépée has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is
being undertaken to qualify as a competent person as defined in the JORC Code 2012. Mr Longuépée does not hold securities in Mont
Royal Resources Limited and consents to the inclusion in the report of the matters based on the information in the form and context in
which it appears.
7
8
APPENDIX A - JORC CODE, 2012 EDITION
Table 1 – JORC Code 2012 Edition
Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)
Criteria
Sampling techniques
JORC Code explanation
•
•
•
•
Drilling techniques
Drill sample recovery
•
•
•
•
Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to
obtain 1m samples from which 3
kg was pulverised to produce a 30
g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation
types (eg submarine nodules) may
warrant disclosure of detailed
information.
Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
Method of recording and
assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
Commentary
•
N/A (LiDAR Survey)
•
Drill core identified intervals were
cut in half with one half kept for
archive and the second half
pulverized for assaying.
Sample length (from 20cm to 2m)
was determined by the visual
identification of sulfides and limit of
recognizable geological units.
•
N/A (LiDAR Survey)
•
•
•
•
Core drilling
NQ size
Standard tube
Non-oriented core
N/A (LiDAR Survey)
•
•
•
•
Core recovery is 98.8%.
Core recovery was calculated by
measuring recovered core length
over 3m intervals (tube length).
There is no relation between
recovery and grade.
Only two intervals have recovery
below 80%.
9
Criteria
Logging
JORC Code explanation
•
•
•
Sub-sampling techniques and
sample preparation
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc)
photography.
The total length and percentage of
the relevant intersections logged.
Commentary
N/A (LiDAR Survey)
•
•
•
•
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise representivity
of samples.
Measures taken to ensure that the
sampling is representative of the
in-situ material collected, including
for instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
•
•
•
The nature, quality and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their
derivation, etc.
Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
•
N/A (LiDAR Survey)
•
Gold was determined by Fire
assays ICP-MS on 30g subsample.
Trace elements were measured
using 4-acids digestion ICP-MS.
This is a “near total digestion”,
Sample with Cu > 1% were reassayed by ICP-OES.
Major elements (whole rock
assays) were done for six samples
by lithium Borate Fusion ICP-MS.
This is a total technique.
Quality control samples (blanks
and standards) were added before
shipping to labs. Three QC
samples were included at the start
of every drill hole and one at every
ten samples afterward.
QA/QC is also done by the lab with
blanks, standards and duplicates.
•
•
•
•
•
•
•
•
Verification of sampling and
assaying
•
•
•
Core was entirely logged on site.
Logging
includes
geological
description of both mineralization
and
barren
intervals,
RQD
determination
and
recovery
calculation.
Logging
is
considered
as
quantitative as geological contact
and samples are considered to
have <10cm of accuracy.
All core was photographed (dry
and wet) on site.
The verification of significant
intersections by either
independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
•
•
•
•
N/A (LiDAR Survey)
Core was cut in half on-site.
The samples were cut, bagged on
industry
site
according
to
standards. Random checks were
made to validate that the bagged
material matched the second core
half.
Pulverization was made in a
commercial lab according to
industry
standards.
Rigorous
QAQC procedure (detailed later)
where put in place to identify
problem along the preparation and
assaying process.
Subsample were taken from
pulverized
and
homogenized
material according to industry
standards.
The sample length (average 88cm)
is suitable given the fine-grained (<
5mm) nature of the mineralization.
N/A (LiDAR Survey)
No independent verification was
done.
No twin hole was drilled.
Data are electronically transferred
from certificates (excel files) to
exploration database (SQL). This
10
Criteria
JORC Code explanation
•
Location of data points
•
•
•
verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay
data.
Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys), trenches,
mine workings and other locations
used in Mineral Resource
estimation.
Specification of the grid system
used.
Quality and adequacy of
topographic control.
Commentary
transfer is a automated
standardized procedure.
LiDAR
•
•
•
•
Drilling
•
•
•
•
•
Orientation of data in relation
to geological structure
•
•
Sample security
•
Audits or reviews
•
Data spacing for reporting of
Exploration Results.
Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and
grade continuity appropriate for
the Mineral Resource and Ore
Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has
been applied.
Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported
if material.
The measures taken to ensure
sample security.
The results of any audits or
reviews of sampling techniques
and data.
LiDAR survey was done using MTM
Nad83 Zone 8 projection.
Horizontal datum: NAD83-CSRS
Vertical datum: CGVD28
Geoid undulation model used:
HT2.0
No ground control station
•
•
Data spacing and distribution
and
1.
2.
•
•
Drill collars were surveyed after
completion of drill holes using a
handheld Garmin GPS with a 1m
accuracy.
Downhole surveys were done every
30m using a Reflex EZ-Trac.
Hole location was done using the
UTM NAD83 (zone 19) geographic
reference system.
LiDAR Survey
Density points for LiDAR: 6-8 pts/m2
Photos resolution: 8cm/pixel
Drilling
Spacing between hole was planned
at 200m as it was an exploration
program along a prospective kmlong geological unit.
•
Final spacing (average 188m) was
adjusted to minimize environmental
impact.
•
The
spacing
is
considered
adequate for the type of deposit and
because the data are not used for
resources estimation.
•
•
N/A (LiDAR Survey)
•
Drill
hole
were
perpendicular to the
geological unit.
•
Drill hole orientation proved to be
perfect given the geological contact
angle to core axis greater than 70
degrees.
•
•
N/A (LiDAR survey)
No particular measures were taken
(Drilling)
•
No audit was performed on the
LiDAR data or Drilling program
oriented
targeted
11
Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to
this section)
Criteria
Mineral tenement and land
tenure status
JORC Code explanation
•
•
Exploration done by other
parties
•
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical
sites, wilderness or national park
and environmental settings.
The security of the tenure held at
the time of reporting along with any
known impediments to obtaining a
license to operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
Commentary
•
•
•
•
•
The LiDAR survey covers 175 of the
194 map designated claims of the
Bohier property.
These claims are 100% owned by
Northern Lights Minerals Pty Ltd
The claims on which the drilling
was done are under option to
Focus Graphite.
The claims are in good standing.
There are no impediments in
regard to environment or first
nations rights.
Past Survey/Airborne exploration
•
•
•
•
•
Exploration in the area is limited.
Regional magnetic survey was
done in the early 1990’s.
MaxMin survey and trenching done
in 1996 by Geonova
Prospection, sampling, and drilling
on MaxMin targets by GeoNova in
1997.
Prospection done by Mine Virginia
in 2011.
Past Drilling
•
•
•
•
•
•
•
Exploration in the vicinity of the
drilled zones is relatively limited
and can be resumed as:
Prospection and discovery of the
Alta occurrence in 1957.
Ground geophysics, trenching and
drilling (7 shallow holes) in the late
1950’s.
Geophysics and drilling (7 holes) in
the late 1970’s.
Project assessment between 1980
and 2017.
Regional geophysics and till
sampling with follow-up work in
2017 and 2018.
Soil survey in 2022.
The property is generally underexplored, but
the Alta occurrence is a drill-ready target.
Geology
•
Deposit type, geological setting
and style of mineralisation.
•
•
The Upper Eastmain Greenstone
belt is an Archean Greenstone Belt
part of the Opatica Subprovince.
The
only
known
mineral
occurrences on the property are
vein-hosted
silver-lead
occurrences.
12
Criteria
Drill hole Information
JORC Code explanation
•
•
Data aggregation methods
•
•
•
Relationship between
mineralisation widths and
intercept lengths
•
•
•
Diagrams
•
A summary of all information
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
o
easting and northing of the
drill hole collar
o
elevation or RL (Reduced
Level – elevation above sea
level in meters) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and
interception depth
o
hole length.
If the exclusion of this information
is justified on the basis that the
information is not Material and this
exclusion does not detract from
the understanding of the report,
the Competent Person should
clearly explain why this is the
case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where aggregate intercepts
incorporate short lengths of highgrade results and longer lengths of
low-grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations
should be shown in detail.
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
These relationships are
particularly important in the
reporting of Exploration Results.
If the geometry of the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.
If it is not known and only the
down hole lengths are reported,
there should be a clear statement
to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include, but
not be limited to a plan view of drill
hole collar locations and
appropriate sectional views.
Commentary
•
•
•
N/A (LiDAR survey)
The information is provided in
tables and figures in the press
release.
Elevation is defined by the collar
position on 1:50,000 topographic
map. Its accuracy is therefore in
the 2 meters range.
•
N/A (LiDAR survey)
•
Mineralized intervals are presented
as weighted averages over the
reported lengths following these
criteria:
o
No maximum grade
o
Cut-off at 0.4% Cu
o
Intervals with grade lower
than the 0.4% Cu cut-off are
included, only if they are
narrower than 2m (max
included interval is 1.65m in
ALT-23-04 lower interval).
Details of the used grades and lengths are
provided in the text.
•
•
•
•
•
N/A (LiDAR survey)
An angle to core axis greater than
80 degrees for holes drilled at -45
degrees (ALT-23-01, ALT-23-03,
ALT-23-05
and
ALT-23-06),
suggest that mineralization width is
similar to intercept lengths.
Angle to core axis for holes at -80
degrees (Alt-23-02 and ALT-23-04)
are shallower (55 degrees)
indicating that the mineralized
width is approximately 75% of the
intercept lengths in these two
holes.
N/A (LiDAR survey)
Provided in the above
release
press
13
Criteria
JORC Code explanation
Balanced reporting
•
Other substantive exploration
data
•
Further work
•
•
Where comprehensive reporting of
all Exploration Results is not
practicable, representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
Other exploration data, if
meaningful and material, should
be reported including (but not
limited to): geological
observations; geophysical survey
results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and
rock characteristics; potential
deleterious or contaminating
substances.
The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Commentary
•
N/A (LiDAR survey)
•
Interpretation
of
potential
pegmatite occurrence was made
using the LiDAR (digital elevation
model) and airphotos based on
three criteria:
o
White / light color.
o
Positive
topographic
feature.
o
Located
within
the
greenstone belt.
No chemical or mineralogical data
are available; therefore, the
interpretation is to be used as an
exploration guide and are not
exploration results.
•
N/A (drilling)
LiDAR Survey
•
•
A mapping and sampling program
is planned to confirm the LiDAR
interpretation.
Maps show the two main target
area for follow-up work. These are
based on potential pegmatite
density.
Drilling
•
•
•
•
Mineralization is open at depth at
ALT-23-02 and ALT-23-04.
Additional drilling is required to the
SW as ALT-23-06 may have
undercut the mineralization.
Additional drilling is required to the
NE as ALT-23-05 may been too
shallow.
Borehole EM is planned to identify
off-hole sulphide-rich zones.
14