Bohier Project Delivers High Grade Li2O Results
Released
Released
Announcement PDF
ASX:MRZ
ASX ANNOUNCEMENT – 2 NOVEMBER 2023
PHASE TWO EXPLORATION DELIVERS HIGH GRADE Li2O RESULTS
HIGHLIGHTING 500 METER MINERALISED LITHIUM
EXPLORATION TARGET AT BOHIER
HIGHLIGHTS
Phase Two lithium exploration expands the footprint of the Bohier Lithium Project.
Promising high grade results from trenching and channel sampling program include:
o
6.05m @ 1.78% Li2O,
o
7m @ 1.71% Li2O and
o
1m @ 1.97% Li2O
Ground geophysics at Bohier expands lithium target 500 metres to the South West,
linking an additional spodumene bearing pegmatite.
18 samples remain outstanding in the Actlabs laboratory facility in Val d’or, Quebec.
Preparations for a lithium drilling program are underway to commence this coming
2023/24 winter drilling season to test advanced targets at Bohier.
Mont Royal Resources Limited (“Mont Royal”, the “Company”) (ASX:MRZ) is pleased to announce
further exploration progress from the Phase Two lithium exploration program from the Bohier
Project in the Upper Eastmain Greenstone Belt located in Quebec, Canada.
The exploration activity included trenching, channel/grab sampling, ground geophysics and
additional LiDAR survey to rank and prioritise drill ready targets for the upcoming winter exploration
season. The three most promising samples were placed on express analysis and have been included
in this announcement. Results for a further18 samples are currently in the Actlabs facility with
results pending.
Mont Royal Executive Director, Peter Ruse, commented: “Mont Royal is pleased to report
encouraging results gained from the Phase Two of our lithium exploration at the Bohier Lithium Project.
Our Technical team has now confirmed that an advanced 500m target has been outlined by the two
known spodumene pegmatite outcrops and a third spodumene bearing outcrop located to the South West.
This trend sits on a dyke system that identified a series of low gravity anomalies, one of which is in direct
continuity of the known pegmatite exposure and extending 500m to the west. This has greatly improved
our confidence to now advance towards a maiden drill program during the winter exploration season.”
Mont Royal Resources Ltd
Level 8, 2 Bligh Street
info@montroyalrres.com
ACN 625 237 658
Sydney NSW 2000
www.montroyalres.com
ASX:MRZ
Bohier Trenching and Geophysics program
Recent work carried out at Bohier was two-fold, as a gravimetry survey was completed
simultaneously with the trenching and channel sampling program at the Bohier pegmatite,
discovered on the first lithium prospecting phase in July/August 2023.
Gravimetry focused on the western end of the greenstone units, from the property’s west end to
the northeast of the pegmatite outcrops. Trenching and channel sampling first aimed to define the
pegmatite thickness and lateral extents and secondly to identify the source of preliminary
gravimetric anomalies.
The interpretation of gravimetric data, which was greatly enhanced by LiDAR data acquired in June
2023, identified a series of gravimetric lows (pegmatites are less dense than surrounding
greenstones), one of which is in direct continuity of the known pegmatite exposure and extending
500m to the west. This anomaly goes over a small pegmatite outcrop with traces of spodumene
(assay with 75ppm Li), which indicates that the gravimetric low is related to the spodumene
pegmatite. Five other anomalies were interpreted with length varying from 200m to 400m.
3462-3820-3688, v. 1
ASX:MRZ
Figure 1a & 1b - Gravimetric survey results showing the 500m target zone and the three known
pegmaties Source: IOS Geoscientique
The trenching and channel exposed the known pegmatite for a total width of 11 meters. However,
both edges, especially the southern one, were steeply dipping and contact between the pegmatite
and host greenstone could not be reached. To the east, the pegmatite ends abruptly and is likely
cut by a fault that was also interpreted from the gravimetric data.
To the west, the pegmatite pinches to a few centimetres wide, however final gravimetric data,
which became available after demobilization of trenching equipment, suggests that it may swell up
further to the west and/or at depth. Channel samples were taken from the exposed pegmatite and
yielded very encouraging grades of more than 1.7% Li2O over more than 6m.
Three small pits were dug on a preliminary gravimetric low, but all pits ended in sand and boulders
at a depth of 3 meters. The nature of the rock underneath remains unknown.
3462-3820-3688, v. 1
ASX:MRZ
Figure 2 - Channel T3R1
Source: IOS Geoscientifique
3462-3820-3688, v. 1
ASX:MRZ
Figure 3 - Channel T3R1
Source: IOS Geoscientifique
3462-3820-3688, v. 1
ASX:MRZ
Figure 4 - Bohier Lithium Project tenement map
Source: Source: IOS Geoscientifique
3462-3820-3688, v. 1
ASX:MRZ
Further results from Phase Two field programs will continue to be received and analysed by Mont
Royal’s technical team in Quebec. A drilling program is currently being designed and planned now
that new exploration targets at Bohier have been identified.
The Company looks forward to embarking on the next steps of its lithium exploration campaign and
will keep shareholders informed with updates as soon as they become available.
For and on Behalf of the Board
ENDS.
Shaun Menezes | Company Secretary
For Further Information:
Peter Ruse
Jane Morgan
Executive Director
Investor and Media Relations
info@montroyalres.com
+61 405 555 618
jm@janemorganmanagement.com.au
About Mont Royal Resources
Mont Royal Resources Limited (ASX:MRZ) is an Australian company incorporated for the purpose
of pursuing various mining opportunities in the resources sector, with the aim of building
shareholder value by acquiring, exploring, evaluating and exploiting mineral resource project
opportunities.
Mont Royal acquired 75% of Northern Lights Minerals 536 km2 tenement package located in the
Upper Eastmain Greenstone belt – the projects are located in the emerging James Bay area, a tier
1 mining jurisdiction of Quebec, Canada, and are prospective for lithium, precious (Gold, Silver) and
base metals mineralisation (Copper, Nickel).
The Company has a binding JV option agreement with Azimut Exploration Inc. (TSXV: AZM), to
earn-in up to 70% of the Wapatik Gold-Copper Nickel Project. For further information regarding
Mont Royal Resources Limited, please visit the ASX platform (ASX:MRZ) or the Company’s website
www.montroyalres.com
3462-3820-3688, v. 1
ASX:MRZ
@MontRoyalRes
Linkedin.com/Company/mont-royal-resources
Subscribe for Investor Updates
Competent Person’s Statement
The information in this report that relates to exploration results is based on information compiled by Mr
Hugues Longuépée, a Competent Person who is a Member of the Ordre des Géologues du Québec. Mr
Longuépée is a consultant to the Company. Mr Longuépée has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity that is being undertaken
to qualify as a competent person as defined in the JORC Code 2012. Mr Longuépée does not hold securities
in Mont Royal Resources Limited and consents to the inclusion in the report of the matters based on the
information in the form and context in which it appears.
3462-3820-3688, v. 1
ASX:MRZ
Appendix A:
Channel/Trenching location.
Channel
Start
End
Length (m)
East
North
East
North
T1R1
274749
5808961
274754
5808953
9.4
T1R2
274765
5808970
274767
5808964
6.0
T2R1
274744
5808951
274745
5808950
1.0
T2R2
274742
5808954
274742
5808954
0.8
T3R1
274778
5808974
274783
5808966
9.75
Location in UTM NAD83 Zone 19. Acquired with Submeter accuracy.
Channel samples length and grade.
Channel
Sample
From (m)
To (m)
Li2O (%)
T1R1
141890004
0.0
0.91
0.96
T1R1
141890005
0.91
1.80
1.06
T1R1
141890006
2.2
3.1
2.13
T1R1
141890007
3.1
4.1
2.82
T1R1
141890008
4.1
5.1
2.73
T1R1
141890009
5.1
6.05
1.56
T1R1a
141890010
6.45
7.4
0.13
T1R1a
141890011
7.4
8.35
0.33
T1R1a
141890012
8.35
9.4
0.04
T2R1
141890013
3.6
4.6
1.97
T2R2
141890015
0.0
0.8
0.03
T1R2
141890016
0.0
1.15
0.50
T1R2
141890017
1.15
2.35
0.11
T1R2a
141890018
2.75
3.8
0.33
T1R2a
141890019
3.8
4.85
0.12
T1R2a
141890020
4.85
6
0.04
T3R1
141890021
0
0.8
2.03
T3R1
141890022
0.8
1.6
1.75
T3R1
141890023
1.6
2.6
0.62
T3R1
141890025
2.6
3.75
1.72
T3R1
141890026
3.75
4.7
2.37
T3R1
141890027
4.7
5.95
1.53
T3R1
141890028
5.95
7.0
1.86
T3R1
141890029
7.0
8.0
0.02
T3R1
141890030
8.0
9.75
0.31
3462-3820-3688, v. 1
ASX:MRZ
APPENDIX B - Table 1 (grab samples)
Section 1 Sampling Techniques and Data (Criteria in this section apply to all
succeeding sections.)
Criteria
Sampling techniques
JORC Code explanation
Commentary
•
•
•
•
•
Drilling techniques
•
Drill sample recovery
•
•
•
Logging
•
•
3462-3820-3688, v. 1
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
•
•
Grab samples of about 1 kg were taken by using hammer
and chisel.
One grab sample (151290272) from the Wahemen
boulder field weighted approximately 30 kg for better
representativity.
Cut channel samples were of various length to represent
subtle lithological / textural changes or to be as constant
as possible. Channels were cut with double blades rock
saw. Width of the channel is 3cm (1 inch) and depth
averages approximately 12 cm.
•
Not applicable as no drilling was undertaken
•
Not applicable as no drilling was undertaken
•
Channel samples were logged and photographed.
Description is limited to rock type and visual estimate of
spodumene content.
ASX:MRZ
Criteria
Sub-sampling techniques and
sample preparation
JORC Code explanation
The total length and percentage of the
relevant intersections logged.
•
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
•
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
The verification of significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
Verification of sampling and
assaying
•
•
•
Location of data points
•
•
•
3462-3820-3688, v. 1
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
Dried samples were entirely crushed and homogenized.
Samples were then riffled, and a small proportion was
assayed.
The sample preparation was done according to industry
standard and appropriate for the type of sample and
commodity.
No replicate was done nor any subsampling QC
procedure for the three samples set.
Witness samples (duplicate) were taken but not
assayed. They are stored at IOS Services
Geoscientifiques facilities and available if required.
Grab sample size should not be considered as fully
representative for the type of deposit. Pegmatite requires
large (several kg) sample which was impossible to do
during the current exploration stage. The results are to be
considered as indicative of lithium occurrence but not as
definitive grade.
One large grab sample (30 kg) is considered as
representative for that type of deposit.
Channel samples are considered as representative given
their length and weight.
Assays were done by ICP-OES and ICP-MS following a
Peroxide “Total” Fusion. This method enables full metal
recovery except for sodium. This method is appropriate
for the current set of samples.
QAQC was done by inserting blanks (6) and standard (5;
OREAS 147) samples. QAQC samples results were
deemed appropriate.
The results presented here are from grab (outcrops and
boulders) and channel samples. They cannot be used for
intersection calculation.
Data are copied from the lab certificate into a centralized
SQL database.
Location of meaningful samples are stated in the table at
the end of the announcement.
Grab samples’ location is measures with a GPS
integrated in the electronic notebook with an accuracy of
approximately 2 meters.
ASX:MRZ
Criteria
JORC Code explanation
•
Quality and adequacy of topographic
control.
Commentary
•
•
•
•
Data spacing and distribution
•
•
•
Orientation of data in relation
to geological structure
•
•
Sample security
Audits or reviews
•
•
Channel samples were located using A Geode external
GPS connect to field tablet. The accuracy is
approximately 1m.
Grid System used at Léran: UTM Nad83 Zone 19
Grid System used at Bohier: UTM Nad83 Zone 18
Not applicable as no systematic sampling nor drilling was
undertaken.
Data spacing for reporting of
Exploration Results.
Whether the data spacing, and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
•
Not applicable as no systematic sampling nor drilling was
undertaken.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
•
Not applicable as no systematic sampling nor drilling was
undertaken.
•
Samples were put in plastic bags and close with a tiewraps (zip-ties).
Samples were taken by truck to the IOS warehouse by
the field crew.
The results of any audits or reviews of
sampling techniques and data.
•
•
Not applicable as not audit was undertaken
Section 2 Reporting of Exploration Results (Criteria listed in the preceding
section also apply to this section)
Criteria
Mineral tenement and land
tenure status
JORC Code explanation
•
•
Exploration done by other
parties
Geology
•
•
Commentary
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a license to
operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
•
Deposit type, geological setting and
style of mineralisation.
•
•
•
•
•
3462-3820-3688, v. 1
The land is part of Quebec’s Category III land on which
mineral exploration is permitted by the Government and
First Nations.
All the exploration claims are secured and there are no
impediments to operate.
Exploration has been carried out in the area for more than
60 years.
Lithium was not a targeted commodity in the previous
years, so none of the work addressed the potential nor
properly looked at the pegmatites in the area.
Both Bohier and Léran project sit on an Archean
Greenstone Belt with known volcanogenic massive
sulphides (VMS) occurrences.
The occurrences of lithium pegmatites have only recently
been acknowledged.
ASX:MRZ
Criteria
JORC Code explanation
Drill hole Information
•
•
Data aggregation methods
•
•
•
Relationship between
mineralisation widths and
intercept lengths
•
•
•
Diagrams
Balanced reporting
3462-3820-3688, v. 1
•
•
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in meters)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg
‘down hole length, true width not
known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
Commentary
•
Not applicable as no drilling was undertaken
•
Mineralized intervals from the channel samples are
presented as weighted averages over the reported
lengths following these criteria:
• No maximum grade
• Cut-off at 0.5% Li2O
• Intervals with grade lower than the 0.5% Li2O cutoff are included, only if they are narrower than 2m
•
The length of the channel samples was measured
according to the rock exposure. In some instances, the
surface was dipping at 30 degrees which means that the
samples length is longer than the actual thickness.
However, since the dip of the pegmatite could not be
measured, the relation between channel sample length
and true width remains uncertain.
•
Maps of the Wahemen and Tatalum trend boulders are
provided in the text.
Maps and photos of the channel are provided in the text.
•
•
All available assays have been reported. The assays
were batched according to prospectivity and therefore the
first batch (being the most prospective) should not be
considered to be representative of all samples taken and
sent for assay.
ASX:MRZ
Criteria
JORC Code explanation
Other substantive exploration
data
•
Further work
•
•
3462-3820-3688, v. 1
Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey
results; geochemical survey results;
bulk samples – size and method of
treatment; metallurgical test results;
bulk density, groundwater, geotechnical
and rock characteristics; potential
deleterious or contaminating
substances.
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale stepout drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
Commentary
•
All the historical occurrences of pegmatites (all noted as
barren) in the Ministry database have been validate
during field work.
•
•
The Bohier target is drill ready.
Geophysics is required at Leran in order to better define
drill target in the areas where pegmatite boulders where
found.
ASX:MRZ
APPENDIX C - Table 1 (gravimetry surveys)
Section 1 Sampling Techniques and Data (Criteria in this section apply to all
succeeding sections.)
Criteria
Sampling techniques
JORC Code explanation
Commentary
•
•
•
•
•
Drilling techniques
•
Drill sample recovery
•
•
•
Logging
•
•
•
3462-3820-3688, v. 1
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
•
•
•
At Bohier, the Gravimetry survey was done on a 3km wide
grid with 100m-spaced lines and measuring station at
every 20m. A total of 722 stations was done.
At Léran: the gravimetry survey was done on two 300m
lines. There is 75m between the two lines. Stations
spacing varies from 20m at the end of both line and 10m
within the inner 200m. This unusual grid design was drwn
to optimize the details in the area where the occurrence of
the pegmatite dyke was suspected.
The survey was done by two crews using Scintrex CG-6
devices. There were 3 readings at each station. The
acceptable difference between the three reading was
0.007 mgals.
Results were provided as colored maps with profiles and
identified anomalies.
•
Not applicable as no drilling was undertaken
•
Not applicable as no drilling was undertaken
•
Not applicable as no drilling was undertaken
ASX:MRZ
Criteria
JORC Code explanation
Sub-sampling techniques and
sample preparation
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
Verification of sampling and
assaying
•
•
•
Location of data points
•
•
•
•
Data spacing and distribution
•
•
•
3462-3820-3688, v. 1
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
The verification of significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of
Exploration Results.
Whether the data spacing, and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Commentary
•
Not applicable as no drilling was undertaken
•
Not applicable as no drilling was undertaken
•
Not applicable as no drilling was undertaken
•
Each station was located using a Garmon GPS receiver.
The information was used to geo-reference the survey in
the UTM– NAD83 coordinates system.
Bohier is set in zone 18 and Léran in zone 19.
•
•
•
At Bohier: The survey grid was composed of thirty-one
100 meters-spaced lines of various length. The length of
the lines was depending on the interpreted width of the
greenstone belt along the line. Measurements were made
at each 20 meters along those lines.
At Léran: Two 300m lines were made, 75m apart. The
lines were perpendicular to the geological grain but offset
to cover the area of interest. Measurements were made
along 20m station at both east (3 tsations) and west (2
stations) ends, and at every 10m in between.
ASX:MRZ
Criteria
JORC Code explanation
Orientation of data in relation
to geological structure
•
•
Sample security
•
Audits or reviews
•
Commentary
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
•
The lines were oriented perpendicular to the regional
geological structures. At Bohier the lines
Share your feedback
Discover