Quarterly Activities Report
Released
Released
Announcement PDF
ASX:MRZ
ASX ANNOUNCEMENT – 25 JANUARY 2024
DECEMBER 2023 QUARTERLY REPORT
Successful exploration expands key lithium targets in Quebec ahead of drilling
program scheduled for Q1 2024
Mont Royal Resources (ASX: MRZ) (“Mont Royal”, the “Company”) is pleased to provide its
December 2023 Quarterly Report and accompanying Appendix 5B.
HIGHLIGHTS
Northern Lights Lithium Projects (Upper Eastmain Greenstone Belt, Quebec)
-
Exploration footprint of the Bohier Lithium Project expanded with successful second
phase of exploration.
-
Promising high-grade results from trenching and channel sampling program include:
o
6.05m @ 1.78% Li2O;
o
1m @ 1.97% Li2O.
o
-
7m @ 1.71% Li2O; and
Ground geophysics at Bohier expand the lithium target by 500 metres to the southwest, linking with an additional spodumene-bearing pegmatite.
-
Planning well advanced for a drilling program at Bohier commencing Q1 2024.
-
Further high-grade grab samples from the Eastmain-Léran Wahemen Boulder field
deliver assays of up to 4.02% Li2O and 3.51% Li2O from spodumene-rich boulders.
Figure 1: The Upper Eastmain Greenstone Belt with Northern Lights Tenure, Eastmain Léran and Dios (optioned tenure).
Mont Royal Resources Ltd
Error! Unknown document property name.
ACN 625 237 658
Level 8, 2 Bligh Street
info@montroyalrres.com
Sydney NSW 2000
www.montroyalres.com
ASX:MRZ
As a result of successful exploration programs completed last year, Mont Royal has established
three distinct target areas across the Company’s Northern Lights tenements in Quebec:
• The Bohier LCT-bearing pegmatite outcrops, including a 500-metre long exploration target;
• High-grade discoveries within the Eastmain-Léran Wahemen Boulder field; and
• The Eastmain-Léran Central Boulder discovery and 8km tantalum zone.
Bohier Trenching and Geophysics Program
During the quarter, the Company completed additional field work at the Bohier Project with a
gravimetry survey undertaken in parallel with a trenching and channel sampling program at the
Bohier Pegmatite. This target area was discovered during the first lithium prospecting phase in
July/August 2023. The gravimetry survey focused on the western end of the greenstone units,
extending from the property’s west end to the north-east of the pegmatite outcrops. The trenching
and channel sampling program was designed firstly to define the thickness and lateral extents of
the pegmatite and secondly to identify the source of any preliminary gravimetric anomalies
identified.
Figure 2 – Bohier Project map showing lithium occurrences in the south-west.
Mont Royal Resources Ltd
Error! Unknown document property name.
ACN 625 237 658
Level 8, 2 Bligh Street
info@montroyalrres.com
Sydney NSW 2000
www.montroyalres.com
ASX:MRZ
The interpretation of gravimetric data, which was greatly enhanced by LiDAR data acquired in June
2023, identified a series of gravimetric lows (which is significant as pegmatites are less dense than
surrounding greenstones). One of these gravimetric lows represents the direct continuation of the
known pegmatite exposure at surface and extends 500m to the west.
This anomaly extends over a small pegmatite outcrop with traces of spodumene (assays from
surface sampling returned values of 75ppm Li), which indicates that the gravimetric low is related
to the spodumene pegmatite – making it a priority focus for exploration.
Five other anomalies were interpreted with lengths varying from 200m to 400m.
Figure 3 – Gravimetric survey results showing the 500m target zone and the three known pegmaties. Source: IOS Geoscientique.
Eastmain Léran Wahemen Boulder field – Second Phase of Prospecting, Grab Sampling and
LiDAR
During the quarter, Mont Royal completed a second phase of focused exploration at the EastmainLéran Wahemen Boulder field in conjunction with further exploration at Bohier. This program
included additional grab sampling, LiDAR and a gravimetric survey to assist in ranking key targets
and prioritising future exploration efforts. The results reported were placed on express analysis.
ASX:MRZ
At the Eastmain-Léran Wahemen Boulder field, additional surface sampling was undertaken (refer
ASX Announcement - 18 September 2023) to obtain a greater number of representative results
from larger samples. Two samples returned outstanding lithium grades of 3.51% and 4.02% Li2O,
confirming the high grades encountered in this area.
Eastmain-Léran Central Boulder Discovery
As previously outlined, a review of IOS Services Géoscientfiques’ ARTGoldTM data from a 2017 till
survey highlighted a few tantalum oxide dispersion trains. This new Tantalum-rich zone in the
central section of the Eastmain-Léran Property (see Figure 1) was the focus of a prospecting
program.
A spodumene-bearing boulder was identified which returned an assay of 1.12% Li2O, opening up a
new prospective area approximately 8km from the Wahemen Boulder field.
Future Work at Eastmain-Léran
During the second phase of prospecting, a 90km2 LiDAR survey was flown across the Tantalum
(Ta)-rich zones and boulder field area at the Eastmain Léran Project. Due to seasonality (area
currently covered in snow) the LiDAR data will be interpreted in the upcoming month and used as
a head start for the 2024 mapping/prospecting season.
Given the scarcity of outcrops and signs of a low gravimetric signature near the Wahemen Boulder
field, an additional gravimetric survey is planned during the winter to further identify target(s) to be
drilled as a secondary program in addition to the advanced exploration target at the Bohier Project.
Figure 5: Eastmain-Léran Project showing locations of the lithium occurrences within the Wahemen Boulder Field.
ASX:MRZ
WAPATIK PROJECT
Maiden Lithium Prospection Program
During the quarter, analysis of results from previous lithium exploration programs at the Wapatik
Project were completed by Mont Royal and its joint venture partner, Azimut Exploration.
The Wapatik Project encompasses several pegmatite dykes visible from the air. The project is
situated 18km north of the Allkem’s James Bay Lithium Project (Mineral Resource Estimate of
40.3Mt at 1.4% Li2O and Ore Reserve of 37.2Mt at 1.3% Li2O.; ref. Allkem Website).
Till sampling was used to target priority areas with Tantalum and Caesium analysis. The western
third of the property appears prospective, as well as several areas in its centre. Targeting will be
further advanced using in-house remote sensing processing.
CORPORATE
Eastmain-Leran Project, Third Milestone Payment and completion of Project acquisition
During the quarter, the Company completed the third and final milestone payment to Focus
Graphite Inc. (TSXV: FMS) to acquire the Eastmain Léran Project in the Upper Eastmain Greenstone
Belt located in Quebec, Canada. Completion of the transaction occurred on 4 December 2023.
The Board of Mont Royal satisfied the 4 December 2023 payment obligation on the following basis:
-
Cash Consideration: C$400,000
-
Share consideration: 2,734,858 Fully Paid Ordinary shares in MRZ
The share consideration, which represents C$400,000, was calculated on the basis of a deemed
issue price $0.163 (10-day average closing price of MRZ) and an exchange rate AUD/CAD:
0.8973.
Financial Position
The Company held $1.888 million in cash at the end of the December 2023 Quarter. Mont Royal
continues to maintain strict cost controls with no large recurring general and administrative (G&A)
expenses. All necessary documentation has been submitted and received by Quebec government
in relation to receipt of tax rebates from past sunk exploration expenditure in FY2023 and rebates
of approximately CAD$900,000 are expected to be received in Q1CY2024.
A summary of the expenditure incurred on exploration activities is set out below. No development
or production activities were undertaken during the December 2023 Quarter.
ASX:MRZ
Appendix
ASX
5B
description
reference
reference
2.1(d)
Exploration and
Amount
Company Summary
$788,000
This item relates to lithium prospecting
evaluation (if
programs at Eastmain Léran and Bohier
capitalised)
undertaken during the last quarter and
payment of the final milestone payment for the
acquisition of the Eastmain Léran Project.
The aggregate total of payments to related parties and their associates, is disclosed in item 6.1 of
the Appendix 5B pertaining to payments of executive and non-executive directors' fees.
The Board of Mont Royal would like to thank shareholders for their continued support. We remain
in an exciting exploration phase of the company’s journey and look forward to undertaking a further
drilling program at Bohier in Q1CY2024.
This announcement was approved for release by the Board.
ENDS.
For and on Behalf of the Board
Shaun Menezes | Company Secretary
Competent Person’s Statement
The information in this report that relates to exploration results is based on information compiled by Mr Hugues Longuépée, a Competent
Person who is a Member of the Ordre des Géologues du Québec. Mr Longuépée is a consultant to the Company. Mr Longuépée has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is
being undertaken to qualify as a competent person as defined in the JORC Code 2012. Mr Longuépée does not hold securities in Mont
Royal Resources Limited and consents to the inclusion in the report of the matters based on the information in the form and context in
which it appears.
About Mont Royal Resources
Mont Royal Resources Limited (ASX: MRZ) is an Australian-based company that owns 75% of the
Northern Lights Minerals 536 km2 tenement package, located in the Upper Eastmain Greenstone belt
– the projects are located in the emerging James Bay area, a tier 1 mining jurisdiction of Quebec,
Canada, and are prospective for lithium, precious (gold-silver) and base metals (copper-nickel)
mineralisation.
The Company also has a binding JV option agreement with Azimut Exploration Inc. (TSXV: AZM), to
earn-in up to 70% of the Wapatik Gold-Copper Nickel Project.
ASX:MRZ
For further information regarding Mont Royal Resources Limited, please visit the ASX platform (ASX:
MRZ) or the Company’s website www.montroyalres.com
@MontRoyalRes
Linkedin.com/Company/mont-royal-resources
Subscribe for Investor Updates
ASX:MRZ
Annexure – Mining Tenement Information
The Company is party to a binding JV option agreement with Azimut Exploration Inc. (TSXV: AZM),
to earn-in up to 70% of the Wapatik Gold-Copper Project, located in James Bay area, a tier 1 mining
jurisdiction of Quebec, Canada.
On 1 December 2021, the Company completed the acquisition of 75% of Northern Lights Minerals
Pty Limited (“NLM”) which holds a substantial land package across the Upper Eastmain Greenstone
belt in Quebec, Canada.
In addition, a subsidiary of NLM holds rights to acquire 100% of the rights in assets held by Focus
Graphite Inc. The Company earned an interest in these tenements during the quarter.
NLM also is party to an agreement with Dios Exploration Inc providing NLM the rights to acquire a
70% interest in certain claims (and associated mining information). The Company has not yet earned
an interest in the tenements. Further details are set out in the Company’s announcement dated 3
September 2021.
The Company confirms that no tenements were disposed of during the quarter. New tenements
acquired are listed below.
Project
Location
Eastmain Leran (Focus Graphite
Quebec, Canada
tenements)
Tenement/Title Number
28001 – 28020
28133
32570 – 32577
47480 – 47482
2366180 – 2366308
2366403 – 2366504
2366511 – 2366512
2367332 – 2367339
2486140 – 2486145
2513157 – 2513400
2515373
2520337 – 2520338
2530140 - 2530150
ASX:MRZ
The following tenements are held at 31 December 2023:
Project
Location
Northern Lights
Quebec, Canada
Tenement/Title Number
2556880 – 2557189
2558307 – 2558325
2565968 – 2565987
2538870 – 2538914
2543213 – 2543214
2543450
Eastmain Leran
Quebec, Canada
28001 – 28020
28133
32570 – 32577
47480 – 47482
2366180 – 2366308
2366403 – 2366504
2366511 – 2366512
2367332 – 2367339
2486140 – 2486145
2513157 – 2513400
2515373
2520337 – 2520338
2530140 - 2530150
Eastmain-Leran
Claims
(North)
Staked
Quebec, Canada
2691258 - 2691272
Share your feedback
Discover