Half Year Financial Report 31 December 2023
Released
Released
Announcement PDF
MONT ROYAL RESOURCES
LIMITED AND ITS
CONTROLLED ENTITIES
ACN: 625 237 658
Financial Report
For the Half Year Ended
31 December 2023
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
CONTENTS
Page
Directors' Report
2
Auditor's Independence Declaration
5
Consolidated Statement of Profit or Loss and Other
Comprehensive Income
6
Consolidated Statement of Financial Position
7
Consolidated Statement of Changes in Equity
8
Consolidated Statement of Cash Flows
9
Notes to the Consolidated Financial Statements
10
Directors' Declaration
15
Independent Auditor’s Review Report
16
1
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
DIRECTORS’ REPORT
Your directors present their report on the consolidated group for the half year ended 31 December 2023.
Directors
The names, qualifications and experience of the directors in office at any time during, or since the end of, the period
are as follows. Directors have been in office for the entire period unless otherwise stated.
Gary Lawler (Non-Executive Chairman)
Peter Ruse (Executive Director)
Ronnie Beevor (Non-Executive Director)
Principal Activities
The principal activity of the consolidated group during the period was the farm-in and exploration of the Wapatik GoldCopper Project and the exploration on the Northern Lights Minerals projects in the Upper Eastmain Greenstone Belt
in Quebec, Canada.
Review of Operations
The consolidated loss of the consolidated group for the financial period after providing for income tax amounted to
$465,361 (2022: $405,769).
Mont Royal Resources (ASX: MRZ) has built a significant position in an underexplored greenstone belt in the James
Bay area of Quebec, Canada, with the Company’s Northern Lights and Wapatik Lithium Projects, both strategically
located in the lower and upper regions of the belt (Figure 1). The projects are prospective for lithium, precious (gold,
silver) and base metal mineralisation (copper, nickel).
Figure 1: Project Locations
Northern Lights Projects
As a result of successful exploration programs, Mont Royal has established three distinct target areas across the
Company’s Northern Lights tenements in Quebec:
•
The Bohier LCT-bearing pegmatite outcrops, including a 500-metre long exploration target;
•
High-grade discoveries within the Eastmain-Léran Wahemen Boulder field; and
•
The Eastmain-Léran Central Boulder discovery and 8km tantalum zone.
The Bohier LCT-bearing pegmatite outcrops were identified through the Company’s first lithium prospecting phase in
July/August 2023. Follow-up field work comprised a gravimetry survey undertaken in parallel with trenching and
channel sampling at the Bohier Pegmatite.
The gravimetry survey focused on the western end of the greenstone units, extending from the property’s west end
to the north-east of the pegmatite outcrops. The trenching and channel sampling program was designed firstly to
2
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
DIRECTORS’ REPORT
define the thickness and lateral extents of the pegmatite and secondly to identify the source of any preliminary
gravimetric anomalies identified.
Gravimetric data identified a series of gravimetric lows (which is significant as pegmatites are less dense than
surrounding greenstones). One of these gravimetric lows represents the direct continuation of the known pegmatite
exposure at surface and extends 500m to the west.
This anomaly extends over a small pegmatite outcrop with traces of spodumene (assays from surface sampling
returned values of 75ppm Li), which indicates that the gravimetric low is related to the spodumene pegmatite – making
it a priority focus for exploration.
Five other anomalies were interpreted with lengths varying from 200m to 400m.
Figure 2 – Gravimetric survey results showing the 500m target zone and the three known pegmaties. Source: IOS
Geoscientique.
High-grade results from the trenching and channel sampling program included 6.05m @ 1.78% Li2O, 7m @ 1.71%
Li2O and 1m @ 1.97% Li2O.
Planning is well advanced for an initial drilling program at Bohier commencing in H1 2024.
At the Eastmain Léran Wahemen Boulder field, grab sampling at the Wahemen Boulder field returned results including
2.41%, 3.51% and 4.02% Li2O in an area approximately 1km northeast of a historical lithium occurrence (press
release dated 4th September 2023).
Observations from field work have confirmed the pegmatite boulders, up to 4m long, contain spodumene crystals up
to 50cm long and beryl. The other boulders from the field are composed of local greenstones.
The boulder field location and boulders’ composition strongly suggest that the source of these blocks is located
northeast (i.e., up-ice), in a greenstone unit and no further than 1.2km away from where the contact between
greenstone and granite has been found. Geological mapping and sampling along a series of closely spaced NW-SE
traverses has since been completed.
A review of IOS Services Géoscientfiques’ ARTGoldTM data from a 2017 till survey highlighted a few tantalum oxide
dispersion trains. This new Tantalum-rich zone in the central section of the Eastmain-Léran Property was the focus
of a prospecting program. A spodumene-bearing boulder was identified which returned an assay of 1.12% Li2O,
opening up a new prospective area approximately 8km from the Wahemen Boulder field.
3
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
DIRECTORS’ REPORT
A 90km2 LiDAR survey was flown across the Tantalum-rich zones and boulder field area at the Eastmain Léran
Project. LiDAR data will be interpreted in Q1 2024 to support planning for the 2024 mapping/prospecting season.
Given the scarcity of outcrops and signs of a low gravimetric signature near the Wahemen Boulder field, an additional
gravimetric survey is planned during the winter to further identify target(s) to be drilled as a secondary program in
addition to the advanced exploration target at the Bohier Project.
Wapatik Project
During the reporting period, Mont Royal and its joint venture partner, Azimut Exploration, completed a lithium
exploration program at the Wapatik Project.
The Wapatik Project encompasses several pegmatite dykes visible from the air. The project is situated 18km north of
the Allkem’s James Bay Lithium Project (Mineral Resource Estimate of 40.3Mt at 1.4% Li2O and Ore Reserve of
37.2Mt at 1.3% Li2O.; ref. Allkem Website).
Till sampling was used to target priority areas with Tantalum and Caesium analysis. The western third of the property
appears prospective, as well as several areas in its centre. Targeting will be further advanced using in-house remote
sensing processing.
Corporate
Eastmain-Leran Project, Third Milestone Payment and completion of Project acquisition
During the reporting period, Mont Royal completed the third and final milestone payment to Focus Graphite Inc.
(TSXV: FMS) to acquire the Eastmain Léran Project in Quebec’s Upper Eastmain Greenstone Belt. Completion of
the transaction occurred on 4 December 2023.
The Board of Mont Royal satisfied the 4 December 2023 payment obligation on the following basis:
•
Cash Consideration: C$400,000
•
Share consideration: 2,734,858 Fully Paid Ordinary shares in MRZ
The share consideration, which represents C$400,000, was calculated on the basis of a deemed issue price $0.163
(10-day average closing price of MRZ) and an exchange rate AUD/CAD: 0.8973.
Significant Changes in the State of Affairs
There were no significant changes in the consolidated group’s state of affairs during the financial period.
Events Subsequent to the End of the Reporting Period
No matters or circumstances have arisen since the end of the financial period which significantly affected or may
significantly affect the operations of the consolidated group, the results of those operations, or the state of affairs of
the consolidated group in future financial periods.
Auditor’s Independence Declaration
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act 2001 is
included within this financial report.
Signed in accordance with a resolution of the Directors.
On behalf of the Directors
Peter Ruse
Executive Director
28 February 2024
4
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9
Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
DECLARATION OF INDEPENDENCE BY JACKSON WHEELER TO THE DIRECTORS OF MONT ROYAL
RESOURCES LIMITED
As lead auditor for the review of Mont Royal Resources Limited for the half-year ended 31 December
2023, I declare that, to the best of my knowledge and belief, there have been:
1.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2.
No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Mont Royal Resources Limited and the entities it controlled during the
period.
Jackson Wheeler
Director
BDO Audit (WA) Pty Ltd
Perth
28 February 2024
BDO Audit (WA) Pty Ltd ABN 79 112 284 787 is a member of a national association of independent entities which are all members of BDO Australia
Ltd ABN 77 050 110 275, an Australian company limited by guarantee. BDO Audit (WA) Pty Ltd and BDO Australia Ltd are members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms. Liability
limited by a scheme approved under Professional Standards Legislation.
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
Note
31 December
2023
$
31 December
2022
$
16,583
9,528
(456,660)
(25,284)
(415,297)
-
Loss before tax
Income tax expense
Loss for the period
(465,361)
(465,361)
(405,769)
(405,769)
Other comprehensive loss
Items which may be re-classified to profit or loss
Exchange differences on translation of foreign operations
(220,364)
(234,054)
(685,725)
(639,823)
(457,364)
(7,997)
(465,361)
(405,769)
(405,769)
(661,515)
(24,210)
(685,725)
(619,463)
(20,360)
(639,823)
Cents
(0.58)
Cents
(0.60)
Interest income
Corporate
Share-based payments expense
8
Total comprehensive loss for the period attributable to the
members
Loss for the period attributable to:
Members of the parent entity
Non-controlling interests
Total comprehensive loss for the period attributable to:
Members of the parent entity
Non-controlling interests
Basic and diluted loss per share (cents per share)
2
The above consolidated statement of profit or loss and other comprehensive income should be read in conjunction with the
accompanying notes.
6
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2023
Note
31 December
2023
$
30 June
2023
$
ASSETS
CURRENT ASSETS
Cash and cash equivalents
Trade and other receivables
Prepayments
TOTAL CURRENT ASSETS
3
4
1,888,782
1,829,111
17,590
3,735,483
2,259,958
1,238,134
28,431
3,526,523
NON-CURRENT ASSETS
Exploration and evaluation expenditure
TOTAL NON-CURRENT ASSETS
5
7,486,801
7,486,801
6,076,557
6,076,557
11,222,284
9,603,080
LIABILITIES
CURRENT LIABILITIES
Trade and other payables
TOTAL CURRENT LIABILITIES
397,257
397,257
611,894
611,894
TOTAL LIABILITIES
397,257
611,894
10,825,027
8,991,186
13,562,268
2,467,918
(5,779,929)
10,250,257
574,770
10,825,027
11,361,378
2,353,411
(5,322,583)
8,392,206
598,980
8,991,186
TOTAL ASSETS
NET ASSETS
EQUITY
Issued capital
Reserves
Accumulated losses
Total parent entity interest
Non-controlling interest
TOTAL EQUITY
6
7
The above consolidated statement of financial position should be read in conjunction with the accompanying notes.
7
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
Note
Consolidated Group
Balance at 1 July 2023
Loss for the period
Other comprehensive lloss
Total comprehensive loss for the
period
Equity transactions:
Issue of shares
Capital raising costs
Share-based payments
Balance at 31 December 2023
Balance at 1 July 2022
Loss for the period
Other comprehensive loss
Total comprehensive loss for the
period
Equity transactions:
Share-based payments
Balance at 31 December 2022
6
6
8
Issued
Capital
$
Reserves
Accumulated
Losses
$
$
Total
$
Non-controlling
interest
$
Total
$
11,361,378
-
2,353,393
(204,151)
(204,151)
(5,322,565)
(457,364)
(457,364)
8,392,206
(457,364)
(204,151)
(661,515)
598,980
(7,997)
(16,213)
(24,210)
8,991,186
(465,361)
(220,364)
(685,725)
2,655,745
(454,855)
13,562,268
318,676
2,467,918
(5,779,929)
2,655,745
(454,855)
318,676
10,250,257
574,770
2,655,745
(454,855)
318,676
10,825,027
11,086,502
-
2,249,487
(213,694)
(213,694)
(4,508,689)
(405,769)
(405,769)
8,827,300
(405,769)
(213,694)
(619,463)
597,922
(20,360)
(20,360)
9,425,222
(405,769)
(234,054)
(639,823)
274,876
11,361,378
2,035,793
(4,914,458)
274,876
8,482,713
577,562
274,876
9,060,275
The above consolidated statement of change in equity should be read in conjunction with the accompanying notes.
8
MONT ROYAL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
CASH FLOWS FROM OPERATING ACTIVITIES
Interest received
Payments to suppliers and employees
Net cash used in operating activities
31 December
2023
31 December
2022
$
$
16,583
(449,512)
(432,929)
9,528
(481,754)
(472,226)
CASH FLOWS FROM INVESTING ACTIVITIES
Government grants and tax incentives
Payments for exploration and evaluation expenditure (capitalised)
Net cash used in investing activities
17,059
(2,003,807)
(1,986,748)
126,903
(1,301,838)
(1,174,935)
CASH FLOWS FROM FINANCING ACTIVITIES
Proceeds from issue of shares
Payments for share issue costs
Net cash from financing activities
2,209,963
(161,462)
2,048,501
-
Net increase/(decrease) in cash held
(371,176)
(1,647,161)
Cash and cash equivalents at the beginning of the period
2,259,958
4,386,497
Cash and cash equivalents at the end of the period
1,888,782
2,739,336
The above consolidated statement of cash flows should be read in conjunction with the accompanying notes.
9
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
(a) Basis of preparation
The interim consolidated financial report is a general purpose financial report prepared in accordance with the requirements of
the Corporations Act 2001 and Accounting Standard AASB 134: Interim Financial Reporting. Compliance with AASB 134
ensures that the financial report and notes also comply with International Financial Reporting Standards IAS 34: Interim
Financial Reporting.
It is recommended that this consolidated interim financial report be read in conjunction with the annual financial report for the
year ended 30 June 2023 and any public announcements made by Mont Royal Resources Limited and its controlled entities
during the half-year in accordance with the continuous disclosure requirements arising under the Corporations Act 2001 and
ASX Listing Rules.
The interim consolidated financial report does not include full disclosures of the type normally included in annual financial
reports.
The interim consolidated financial report has been prepared on an accruals basis and is based on historical costs, cost is based
on the fair value of the consideration given in exchange for assets.
(b) Statement of compliance
The interim financial statements were authorised for issue on 28 February 2024.
The interim financial statements comply with Australian Accounting Standards, which include Australian equivalents to
International Financial Reporting Standards (AIFRS). Compliance with AIFRS ensures that the financial report, comprising the
interim financial statements and notes thereto, complies with International Financial Reporting Standards (IFRS).
(c) New accounting standards and interpretations
The consolidated entity has adopted all of the new or amended Accounting Standards and Interpretations issued by the
Australian Accounting Standards Board ('AASB') that are mandatory for the current reporting period. Any new or amended
Accounting Standards or Interpretations that are not yet mandatory have not been early adopted.
Standards and Interpretations applicable to 31 December 2023
In the period ended 31 December 2023, the Directors have reviewed all of the new and revised Standards and Interpretations
issued by the AASB that are relevant to the Group and effective for the current reporting period. As a result of this review, the
Directors have determined that there is no material impact of the new and revised Standards and Interpretations on the Group
and, therefore, no material change is necessary to Group accounting policies.
Accounting standards and interpretations issued but not yet effective
Certain Australian Accounting Standards and Interpretations have recently been issued or amended but are not yet effective
and have not been adopted by the Group for the reporting period ended 31 December 2023. The Directors have not early
adopted any of these new or amended standards or interpretations. The Directors have not yet fully assessed the impact of
these new or amended standards (to the extent relevant to the Group) and interpretations.
10
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
2. LOSS PER SHARE
The following reflects the income and data used in the calculations of basic and diluted earnings/(loss) per share:
Loss per share (cents)
2023
$
(0.58)
2022
$
(0.60)
Loss used in calculating basic and diluted loss per share
457,364
405,769
Weighted average number of ordinary shares used in calculating
basic loss per share:
# shares
# shares
79,392,402
67,281,023
31 December
2023
$
30 June
2023
$
1,888,782
2,259,958
31 December
2023
$
30 June
2023
$
1,583,604
242,173
3,335
1,829,111
1,026,606
210,290
1,238
1,238,134
31 December
2023
$
30 June
2023
$
3. CASH AND CASH EQUIVALENTS
Cash at bank and on hand
4. OTHER RECEIVABLES
Tax credit and mining rights receivable
GST/QST receivable
Other
Total
5. EXPLORATION AND EVALUATION EXPENDITURE
Balance at the beginning of the period
Exploration and evaluation expenditure incurred during the period
Canadian exploration tax credit offset during the period
Foreign currency translation movement
Balance at the end of the period
6,076,557
2,304,122
(598,371)
(295,507)
7,486,801
4,350,267
2,600,241
(1,065,745)
191,794
6,076,557
The value of the exploration tenements carried forward is dependent upon:
(a) The continuance of the Consolidated Entity’s rights to tenure of the area of interest;
(b) The results of future exploration; and
The recoupment of costs through successful development and exploitation of the areas of interest or alternatively by
their sale.
6. ISSUED CAPITAL
(a) Issued Capital
31 December
2023
$
13,562,268
Fully paid ordinary shares
11
30 June
2023
$
11,361,378
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
6. ISSUED CAPITAL (continued)
(b) Movement in ordinary share capital of the Company:
Date
Details
1/7/2022
1/12/2022
30/06/2023
Balance at beginning of period
Acquisition instalment payment for Focus Graphite
Balance at end of period
67,035,951
1,446,717
68,482,668
11,086,502
274,876
11,361,378
1/7/2023
15/8/2023
Balance at beginning of period
Placement
Cost of capital raising(1)
Acquisition instalment payment for Focus Graphite (Note
8(b))
Balance at end of period
68,482,668
13,812,267
2,734,858
11,361,378
2,209,963
(454,854)
445,782
85,029,793
13,562,269
31 December
2023
$
30 June 2023
2,525,246
2,206,570
(57,328)
146,841
4/12/2023
No. of shares
$
(1) Includes value of broker options (Note 8(a))
7. RESERVES
(a) Share based payments and foreign currency translation reserve
Share based payments reserve
Foreign currency translation reserve
$
(b) Nature and purpose of reserves
Share based payments reserve
The share based payments reserve is the value of equity benefits provided to directors, employees and consultants by the
Company as part of their remuneration.
Foreign currency translation reserve
The foreign currency translation reserve records exchange differences arising on translation of foreign subsidiary accounts.
8. SHARE BASED PAYMENTS
(a) Options
During the half-year ended 31 December 2023, the Company granted 3,000,000 options exercisable at $0.35 expiring 10
November 2026 to the lead manager as part of a capital raising fee. The following table lists the inputs to the model used for
the valuation of the options issued during the half-year.
Number of options
Fair value at measurement date (cents)
Dividend yield (%)
Expected volatility (%)
Risk free rate (%)
Expected life of option
Share price (cents)
Exercise price (cents)
Model used
Value of options
Lead Manager
3,000,000
$0.098
Nil
90%
3.83%
3
$0.20
$0.35
Black – Scholes
$293,392
12
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
8. SHARE BASED PAYMENTS (continued)
(a) Options
During the year ended 30 June 2023, the Company granted 1,500,000 options exercisable at $0.30 expiring 3 years from
date of issue. The options vest in three tranches:
- 500,000 options on grant;
- 500,000 options after 12 months of service;
- 500,000 options after 24 months of service;
(b) Shares
On 4 December 2023 the Company issued 2,734,858 fully paid ordinary shares with a fair value of $445,782 (C$400,000) as
part consideration towards the C$800,000 final instalment payment for the Focus Assets, with the balance paid in cash.
9. CONTINGENT LIABILITIES, LEASE COMMITMENTS AND CONTINGENT ASSETS
As at 31 December 2023 there were no contingent liabilities or contingent assets.
(a) Exploration commitments
At 31 December 2023, the Group has the following commitments relating to exploration expenditure incurred in prospecting
the licensed area of the group’s tenements.
2023
$
Within one year
After one year but not more than five years
Longer than five years
54,206
158,845
213,051
2022
$
149,947
112,630
262,577
(b) Earn-in to Wapatik Gold-Copper Project
On 22 September 2020, the Company announced that it had entered into a binding JV option agreement (“Agreement”) with
Azimut Exploration Inc. ("Azimut") (TSXV: AZM), to earn-in up to 70% of the Wapatik Gold-Copper Project (“Project”). The 70%
earn-in is comprised of two earn-in options. The first option is described below.
First option: Mont Royal has an exclusive option to earn a 50% interest (the “First Option”): by making cash payments to Azimut
aggregating C$80,000; and by funding not less than C$4,000,000 in exploration expenditures on the Project (the “First Option
Earn-In Expenditures”), of which the first C$600,000 ("Initial Commitment") constitutes a firm commitment of Mont Royal.
Subsequent to the Initial Commitment, Mont Royal has the right not to proceed with the First Option. The First Option is set out
below:
Minimum First
Option Earn-In
Expenditures
Period
Cash
Payments
At the latest on the first (1st) anniversary of the
Effective Date1.
C$600,000
C$20,000
At the latest on the second (2nd) anniversary of the
Effective Date1.
C$800,000
C$20,000
At the latest on the third (3rd) anniversary of the
Effective Date2.
C$1,200,000
C$20,000
At the latest on the fourth (4th) anniversary of the
Effective Date
C$1,400,000
C$20,000
Total
C$4,000,000
C$80,000
1. These amounts have been incurred as at 31 December 2023.
2. The full amount of the earn-in expenditure has not been incurred as at 31 December 2023 however Azimut has agreed
to roll the balance of the expenditure into the fourth year commitment.
13
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
9. CONTINGENT LIABILITIES, LEASE COMMITMENTS AND CONTINGENT ASSETS (continued)
(c) Northern Lights Minerals Projects
On 1 December 2021, the Company acquired a 75% interest in Northern Lights Minerals Pty Ltd (“Northern Lights”). Northern
Lights has the right to acquire certain assets pursuant to the following agreements:
(i)
Northern Lights is party to an agreement with Dios Exploration Inc (“Dios”) providing Northern Lights the right to
acquire a 70% interest in the certain claims (and associated mining information) (“Dios Agreement”) (“Dios Assets”);
and
(ii)
a subsidiary of Northern Lights holds rights to acquire 100% of the rights in assets held by Focus Graphite Inc (“Focus
Agreement”) (“Focus Assets”) which was completed on 4 December 2023.
Dios Agreement
Pursuant to the Dios Agreement, Northern Lights has the option to acquire an interest in 70% of the Dios Assets by making
the following further cash payments:
•
C$50,000 on 1 July 2024; and
•
C$50,000 on 1 July 2025.
In addition, in order to exercise the option, Northern Lights must expend not less than C$1.4m of exploration expenditure over
a 5-year period.
10. FINANCIAL RISK MANAGEMENT
The Group’s financial instruments consistent mainly of deposits with banks, short-term investments and payables.
The carrying amounts of the current receivables, current payables and other liabilities are considered to be a reasonable
approximation of their fair value.
11. INVESTMENT IN SUBSIDIARY
Interests are held in the following subsidiary companies:
Name
Mont Royal Exploration Australia Pty Ltd
Mont Royal Resources Canada Inc
Mont Royal Resources Quebec Inc
Northern Lights Minerals Pty Ltd
1256137 BC Ltd
Principal
Activity
Country of
Incorporation
Mineral
Exploration
Mineral
Exploration
Mineral
Exploration
Mineral
Exploration
Mineral
Exploration
Ownership Interest
30 June 2023
Australia
31 December
2023
100%
Canada
100%
100%
Canada
100%
100%
Australia
75%
75%
Canada
75%
75%
100%
12. EVENTS AFTER THE REPORTING PERIOD
There have been no events subsequent to the financial period end that will affect the results as disclosed in this report.
14
MONT ROYAL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
DIRECTORS’ DECLARATION
In accordance with a resolution of the directors of Mont Royal Resources Limited, the directors of the Company declare
that:
1. In the opinion of the directors:
(a) the interim financial statements and notes of the Consolidated Group are in accordance with the Corporations
Act 2001, including:
(i)
giving a true and fair view of the Consolidated Group’s financial positions as at 31 December 2023 and
of their performance for the half year ended on that date; and
(ii) complying with Australian Accounting Standards, the Corporations Regulations 2001, professional
reporting requirements and other mandatory requirements;
(b) there are reasonable grounds to believe that the Company and the consolidated group will be able to pay its
debts as and when they become due and payable.
2. This declaration has been made after receiving the declarations required to be made to the Directors in accordance with
Section 303(5) of the Corporations Act 2001 for the half-year ended 31 December 2023.
Signed in accordance with a resolution of the board of directors
Peter Ruse
Executive Director
28 February 2024
15
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
PO Box 700 West Perth WA 6872
Australia
INDEPENDENT AUDITOR’S REVIEW REPORT
To the members of Mont Royal Resources Limited
Report on the Half-Year Financial Report
Conclusion
We have reviewed the half-year financial report of Mont Royal Resources Limited (the Company) and its
subsidiaries (the Group), which comprises the consolidated statement of financial position as at
31 December 2023, the consolidated statement of profit or loss and other comprehensive income, the
consolidated statement of changes in equity and the consolidated statement of cash flows for the halfyear ended on that date, a summary of significant accounting policies and other explanatory
information, and the directors’ declaration.
Based on our review, which is not an audit, we have not become aware of any matter that makes us
believe that the accompanying half-year financial report of the Group does not comply with the
Corporations Act 2001 including:
(i) Giving a true and fair view of the Group’s financial position as at 31 December 2023 and of its
financial performance for the half-year ended on that date; and
(ii) Complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations
Regulations 2001.
Basis for conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by the
Independent Auditor of the Entity. Our responsibilities are further described in the Auditor’s
Responsibilities for the Review of the Financial Report section of our report. We are independent of
the Company in accordance with the auditor independence requirements of the Corporations Act 2001
and the ethical requirements of the Accounting Professional and Ethical Standards Board’s APES 110
Code of Ethics for Professional Accountants (including Independence Standards) (the Code) that are
relevant to the audit of the annual financial report in Australia. We have also fulfilled our other ethical
responsibilities in accordance with the Code.
We confirm that the independence declaration required by the Corporations Act 2001 which has been
given to the directors of the Company, would be the same terms if given to the directors as at the time
of this auditor’s review report.
Responsibility of the directors for the financial report
The directors of the Company are responsible for the preparation of the half-year financial report that
gives a true and fair view in accordance with Australian Ac
Share your feedback
Discover