Operational Update - Bohier Lithium Project
Released
Released
Announcement PDF
ASX:MRZ
ASX ANNOUNCEMENT – 22 AUGUST 2024
OPERATIONAL UPDATE - RECENTLY COMPLETED DRILLING
PROGRAM AT BOHIER LITHIUM PROJECT
HIGHLIGHTS
-
2024 summer drilling program completed at the Bohier Lithium Project in Canada, with
a total of eight (8) holes drilled for 744 metres.
-
Drilling program completed safely and within budget.
-
Drill core has been dispatched to IOS Geosciences facilities in Chicoutimi for cutting and
sampling before being sent to the laboratory for assaying.
-
Assay results are expected in early October 2024.
-
Follow-up exploration to be considered following receipt of assay results and
compilation of the data in a 3D geological model.
-
Encouraging results received from field work at the Léran Lithium Project also which has
delivered new targets for future exploration.
Mont Royal Resources Limited (“Mont Royal”, the “Company”) (ASX: MRZ) is pleased to advise that
it has successfully completed its 2024 summer drilling program at the Bohier Lithium Project,
located in the world-class James Bay region of Quebec, Canada (see Figure 1). The program was
completed safely and within budget, with a total of eight (8) holes drilled for 744 metres.
Bohier Project – 2024 Drilling Program
A total of 111 samples were taken, with core samples transported to the IOS Geosciences facilities
in Chicoutimi (near Québec City) for sampling. The core will be sent from there to the assay
laboratory, with assays expected to be returned in early October 2024.
The drilling mostly targeted the main BHP-2 pegmatite, near the previously identified surface
exposure and its western extension. One hole (BOH-24-05) targeted the BHP-3 gravity anomaly
and the BHP-2 gravity anomaly at depth.
Mont Royal Resources Ltd
Level 8, 2 Bligh Street
info@montroyalrres.com
ACN 625 237 658
Sydney NSW 2000
www.montroyalres.com
ASX:MRZ
Figure 1: Bohier Lithium Project – Overview, Geology and Location of 2024 Drill-Holes.
.
Bohier Project – Next Steps
Assay results from the drilling are expected to be received in early October 2024. In the meantime,
the dyke geometry will be interpreted using 3D geological software, with a final report (including
results from the 2024 prospecting program) expected in November.
With preliminary analysis of the drill core suggesting rapid undulations in the dyke’s dip, future drill
holes may be located on both sides of the targeted anomalies to increase the chances of success.
ASX:MRZ
Figure 3: Bohier Lithium Project – Drill-Hole Locations Relative to Geophysical Targets.*
Figure 3: Bohier Lithium Project – Drill-Hole Locations Relative to Surface Lithium Occurrences.
ASX:MRZ
Léran Project – 2024 Fieldwork Program
Recently completed reconnaissance fieldwork at the Léran Project has delivered a number of new
targets for follow-up exploration at the Petit Léran prospect.
Petit Léran is the westernmost prospect on the property and was targeted based on the discovery
of a spodumene-bearing boulder in 2023. No outcrops were observed due to the significant layer
of glacial cover; however, several additional spodumene-mineralised blocks were found in the
central part of the area, up-ice of the 2023 discovery.
The size and shape of these blocks (see Figure 4) suggest a nearby source of spodumene
mineralisation. Follow-up exploration work will be undertaken at Petit Léran to determine the
source of the spodumene blocks.
Figure 2: One of the spodumene-bearing pegmatite boulders found at Petit-Léran. Several of these boulders were
found in an area with a 50m radius up-ice of the 2023 discovery.*
Mont Royal Executive Director, Peter Ruse, commented: “We are very pleased to have completed the
Bohier lithium drilling program on time and within budget. Our preliminary analysis also indicates a
potential new structural model for the pegmatites at Bohier, with assay results pending, to put the
company in a strong position to plan future drill targeting. In addition, fieldwork has identified several new
spodumene boulders at Léran, with follow-up exploration planned.”
ASX:MRZ
This announcement was approved for release by the Board.
ENDS
For and on Behalf of the Board
Shaun Menezes | Company Secretary
For Further Information:
Peter Ruse
Nicholas Read
Executive Director
Investor and Media Relations
info@montroyalres.com
+61 419 929 046
nicholas@readcorporate.com.au
About Mont Royal Resources
Mont Royal Resources Limited (ASX: MRZ) is an Australian company that owns 75% of Northern
Lights Minerals 536 km2 tenement package located in the Upper Eastmain Greenstone belt. The
projects are located in the emerging James Bay area, a Tier-1 mining jurisdiction of Quebec,
Canada, and are prospective for lithium, precious (Gold, Silver) and base metals mineralisation
(Copper, Nickel).
The Company has a JV option agreement with Azimut Exploration Inc. (TSXV: AZM), to earn-in up
to 70% of the Wapatik Gold-Copper Nickel Project. For further information regarding Mont Royal
Resources Limited, please visit the ASX platform (ASX: MRZ) or the Company’s website
www.montroyalres.com
ASX:MRZ
@MontRoyalRes
Linkedin.com/Company/mont-royal-resources
Subscribe for Investor Updates
Competent Person’s Statement
The information in this report that relates to exploration results is based on, and fairly represents,
information and supporting documentation prepared by Mr Hugues Longuépée, who is a Member
of the Ordre des Géologues du Québec. Mr Longuépée is a consultant to the Company. Mr
Longuépée has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity that is being undertaken to qualify as a Competent
Person as defined in the JORC Code 2012. Mr Longuépée does not hold securities in Mont Royal
Resources Limited and consents to the inclusion in the report of the matters based on the
information in the form and context in which they appear.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such
forward looking statements/projections are estimates for discussion purposes only and should
ASX:MRZ
not be relied upon. Forward looking statements/projections are inherently uncertain and may
therefore differ materially from results ultimately achieved. Mont Royal Resources Limited does
not make any representations and provides no warranties concerning the accuracy of the
projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws. While the information contained in this report has been prepared in
good faith, neither Mont Royal Resources Limited or any of its directors, officers, agents,
employees or advisors give any representation or warranty, express or implied, as to the fairness,
accuracy, completeness or correctness of the information, opinions and conclusions contained in
this announcement.
Drillhole_id
BOH-24-00
BOH-24-01
BOH-24-02
BOH-24-03
BOH-24-04
BOH-24-05
BOH-24-06
BOH-24-07
BOH-24-08
Azimuth
145
145
145
145
145
145
325
325
145
Dip
-45
-50
-45
-45
-45
-45
-45
-85
-45
Length
9
150
57
63
66
201
45
87
75
Table 1. Drillhole collar location. UTM NAD83 (zone 18).
X
683051
683037
682906
682905
683060
682813
683083
683084
682727
Y
5807231
5807256
5807113
5807114
5807215
5807165
5807187
5807186
5806983
ASX:MRZ
APPENDIX A - JORC CODE, 2012 EDITION
Table 1 – JORC Code 2012 Edition
Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation
Sampling
techniques
•
•
•
•
Drilling
techniques
•
Drill sample
recovery
•
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
Quality of
assay data
and
laboratory
tests
•
•
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’). In
other cases, more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Commentary
•
•
Sampling to start in the upcoming
days
Intervals to be sampled were
determined by the visual identification
of pegmatite and limit of recognizable
geological units.
•
•
•
•
Core drilling
NQ size
Standard tube
Non-oriented core
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
•
•
Core recovery is 99.4%.
Core recovery was calculated by
measuring recovered core length over
3m intervals (tube length).
Only one interval has a recovery
below 80%.
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
•
Core was entirely logged on site.
Logging includes geological
description of both mineralization and
barren intervals, RQD determination
and recovery calculation.
Logging is considered as quantitative
as geological contacts are considered
to have <10cm of accuracy.
All core was photographed (dry and
wet) on site.
N/A
•
N/A
•
•
•
•
•
ASX:MRZ
Criteria JORC Code explanation
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Commentary
•
N/A
•
Drill collars were surveyed after
holes completion using a handheld
Garmin GPS and a Geode antenna,
which gives a 1m accuracy.
Downhole surveys were done every
30m using a Reflex EZ-Trac.
Hole location was done using the
UTM NAD83 (zone 18) geographic
reference system.
•
•
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing, and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
•
•
Spacing between drilling sections
was planned at 200m as it was an
exploration program along a
prospective km-long gravimetry
anomaly.
Final spacing was adjusted to
minimize environmental impact.
The spacing is considered adequate
for the type of deposit and because
the data are not used for resources
estimation.
•
•
•
Orientation
of data in
relation to
geological
structure
•
Sample
security
Audits or
reviews
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
The measures taken to ensure sample security.
•
The results of any audits or reviews of sampling
techniques and data.
•
•
Drill holes were oriented
perpendicular to the targeted
geological unit.
Drill hole dip was set to reach
targeted depth and to hit the
pegmatite at the highest angle
possible.
N/A
•
N/A
•
•
Section 2 Reporting of Exploration Results (Criteria listed in the preceding
section also apply to this section)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
Commentary
•
•
•
Exploration
done by other
parties
•
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
•
•
•
The claims on which the drilling was
done are owned by Mont-Royal
Resources.
The claims are in good standing.
There are no impediments in regard
to environment or first nations rights
This was the first drill program for
lithium on the property.
ASX:MRZ
Criteria
JORC Code explanation
Commentary
Drilling and trenching was done in
the 1990’s for gold, in an area more
than 5km away from the drilling
presented herein.
• The property is generally
underexplored.
• The Upper Eastmain Greenstone belt
is an Archean Greenstone Belt part of
the Opatica Subprovince.
• The Bohier occurrence is
spodumene-rich LCT pegmatite
hosted by basalt.
• The information is provided in tables
and figures in the press release.
• Elevation is defined by the collar
position on 1:50,000 topographic
map. Its accuracy is therefore in the 2
meters range.
•
Geology
•
Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
•
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in meters) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report,
the Competent Person should clearly explain why this is
the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
•
•
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
•
N/A
•
•
Angle to core axis in BOH-24-02 is 60
degrees, which suggest a true with of
9.5m.
Angle to core axis in BH-24-03 is 70
degrees, which suggest a true width
of 11m.
Width and angle to core axis from
hole BOH-24-06 and BOH-24-07
suggest folding. A true width of 10m is
estimated from surface exposure and
preliminary interpretation.
True width will be measured after 3D
modelling of the data in the upcoming
weeks.
Provided in the text.
•
N/A
•
•
•
Diagrams
•
Balanced
reporting
•
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
ASX:MRZ
Criteria
JORC Code explanation
Other
substantive
exploration
data
•
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
•
N/A
Further work
•
The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
•
More drilling is required to validate
extensions and will be planned
according to the 3D model.
Three (3) gravimetric lows are still
untested.
•
Commentary
•