Exploration Update - Bohier Project
Released
Released
Announcement PDF
ASX:MRZ
ASX ANNOUNCEMENT – 12 NOVEMBER 2024
ASSAY RESULTS CONFIRM EXTENSIVE MINERALISED ZONE AT
BOHIER LITHIUM PROJECT
HIGHLIGHTS
-
Assay results received from recently completed 2024 summer drilling program at the
Bohier Lithium Project in Canada, which comprised eight (8) holes for 744 metres.
-
Significant lithium mineralisation intersected in several holes, including:
o
21 metres at 1.39% Li2O in hole BOH-24-07
o
1.45 metres at 2.79% Li2O in hole BOH-24-02
o
-
7.65 metres at 1.89% Li2O in hole BOH-24-06
Mineralisation interpreted to be continuous over a length of 200 metres and a depth of
70 metres and remains open laterally.
-
Several targets remain untested.
Mont Royal Resources Limited (“Mont Royal”, the “Company”) (ASX: MRZ) is pleased to advise that
assay results from the 2024 summer drilling program at the Bohier Lithium Project, located in the
world-class James Bay region of Quebec, Canada (see Figure 1), have confirmed a significant zone
of lithium mineralisation, with four holes intersecting high-grade spodumene mineralisation over
down-hole widths of up to 21 metres.
The maiden drilling program, which comprised eight (8) holes for 744 metres, has reinforced the
outstanding prospectivity of the Bohier Project and its potential to yield new lithium discoveries.
Mont Royal Executive Director, Peter Ruse, commented: “These are very positive results from our
initial drilling program at Bohier, with assays indicating that the lithium mineralisation is continuous over
a strike length of 200 metres and to a depth of 70 metres, with the mineralised zone remaining open
laterally and possibly at depth. The results have significantly enhanced our understanding of the geology
at Bohier, which will underpin a new structural model for future exploration targeting.”
Mont Royal Resources Ltd
Level 8, 2 Bligh Street
info@montroyalrres.com
ACN 625 237 658
Sydney NSW 2000
www.montroyalres.com
ASX:MRZ
Figure 1: Bohier Lithium Project – Overview, Geology and Location of 2024 Drill-Holes.
Bohier Project – 2024 Drilling Program
The 2024 drilling program primarily targeted the main BHP-2 pegmatite, near the previously
identified surface exposure and its western extension.
One hole (BOH-24-05) targeted the BHP-3 gravity anomaly and the BHP-2 gravity anomaly at
depth.
Assay results are detailed in Table 1, with a drilling summary for each hole set out below:
ASX:MRZ
Figure 2: Bohier Lithium Project – Drill-Hole Locations Relative to Geophysical Targets*.
Table 1. Pegmatite intersections and mineralised intervals
Hole
Pegmatite intervals
Mineralised intervals1
From (m)
To (m)
From (m
To (m)
Width (m)
Li2O (%)
BOH-24-02
21.3
32.0
26.95
28.40
1.45
2.79
BOH-24-03
38.5
49.6
-
-
-
n/a2
BOH-24-04
35.2
64.3
-
-
-
n/a3
BOH-24-06
14.9
30.4
22.75
30.40
7.65
1.90
BOH-24-07
32.5
70.0
47.60
68.60
21.00
1.39
1
The intervals were calculated using a cut-off grade of 0.5% Li2O and a maximum of 1 metre between mineralised samples.
2
All samples yielded Li2O grades below the cut-off grade.
3
This interval was not sampled because the mineralised length was not representative of the true width (hole drilled
down-dip).
ASX:MRZ
Drill Hole Summary
BOH-24-01: The hole ended at 150m depth and only intersected different facies of the greenstone
unit.
BOH-24-02: Located south-west of BOH-24-01 and 22m north-west of a small pegmatite
exposure along the BHP-2 gravity anomaly. The hole was drilled at -45o toward the south-east.
The hole ended at 57m, with pegmatite intersected from 21.3m to 32m down-hole.
BOH-24-03: Drilled from the same set-up as BOH-24-02, but with a dip of -70o in order to intersect
the pegmatite at a greater depth and confidently define the dip of the pegmatite dyke. The hole
ended at 63m, with pegmatite intersected from 38.5m to 49.6m down-hole and a mineralised
intercept of 1.45m grading 2.79% Li2O from 26.95m.
BOH-24-04: Collared a few metres away from the main outcrop and drilled towards the south-east
with a dip of -60o. The hole ended at 66m. Three intervals of pegmatite were intersected, but the
core strongly suggests that the hole was drilled almost parallel to the contact. Therefore, the core
was not sampled because priority was given to more representative holes.
BOH-24-05: Set-up north-west of the BHP-3 gravity anomaly, this hole was designed to intersect
the source of the anomaly and the BHP-2 (main) pegmatite at depth. No pegmatite was associated
with the anomaly nor was the main pegmatite intersected. The hole ended at 201m.
BOH-24-06: This hole was added to the original planning in order to drill the main pegmatite with
the correct angle. The hole was collared south-east of the main outcrop and drilled toward the
north-west at a -45o dip. The hole intersected the pegmatite from 14.9m to 30.4m down-hole, with
a mineralised intercept of 7.65m grading 1.9% Li2O from 22.75m. The hole ended at 45m.
BOH-24-07: Collared on the same set-up as BOH-24-06 and drilled at -85o dip. The pegmatite was
intersected from 32.5m to 70m down-hole, with a mineralised intercept of 21m grading 1.39% Li2O
from 47.6m. The hole ended at 87m.
BOH-24-08: Targeted the main pegmatite 200m south-west of the last surface exposure along the
BHP-2 anomaly. The hole was drilled at -45o toward the south-east. No pegmatite was intersected.
Data Interpretation
The absence of pegmatite in hole BOH-24-01 and pegmatite intervals in holes BOH-24-04, -06
and -07 strongly suggest a south-east dipping dyke, which is likely folded at depth.
This represents an important evolution in the Company’s understanding of the local geology, as
2023 field work had suggested a steeply dipping structure.
Located 200m to the south-west, the intercepts in holes BOH-24-02 and -03 indicate that the
same dyke dips to the north-west. This suggests that the dyke dip change laterally. This means
ASX:MRZ
that hole BOH-24-08, drilled further to the south-west, may have missed the pegmatite due to a
change in dip.
Thickness variations of the mineralised zones, as well as grade changes within an 11-15 metresthick dyke, are visible and are to be expected in this type of geological environment.
Figure 3: Bohier Lithium Project – Drill-holes and Cross-Section Locations Relative to Surface Lithium Occurrences.
ASX:MRZ
Figure 4: Bohier Lithium Project – Cross-Section 400 (see Figure 3 for location) Showing Significant Spodumene Intercepts.
ASX:MRZ
Figure 5: Bohier Lithium Project – Cross-Section 200 (see Figure 3 for location) Showing Significant Spodumene Intercepts.
Bohier Project – Next Steps
The 3D analysis of the drill core suggests rapid changes in the dip of the dyke.
The next phase of exploration, which will include drilling of untested targets, will include drill holes
located on both sides of the targeted anomalies to increase the chances of success.
This announcement was approved for release by the Board.
ENDS
For and on Behalf of the Board
Shaun Menezes | Company Secretary
ASX:MRZ
For further information:
Peter Ruse
Nicholas Read
Executive Director
Investor and Media Relations
info@montroyalres.com
+61 419 929 046
nicholas@readcorporate.com.au
About Mont Royal Resources
Mont Royal Resources Limited (ASX: MRZ) is an Australian company that owns 75% of Northern
Lights Minerals 536 km2 tenement package located in the Upper Eastmain Greenstone belt. The
projects are located in the emerging James Bay area, a Tier-1 mining jurisdiction of Quebec,
Canada, and are prospective for lithium, precious (Gold, Silver) and base metals mineralisation
(Copper, Nickel).
The Company has a JV option agreement with Azimut Exploration Inc. (TSXV: AZM), to earn-in up
to 70% of the Wapatik Gold-Copper Nickel Project. For further information regarding Mont Royal
Resources Limited, please visit the ASX platform (ASX: MRZ) or the Company’s website
www.montroyalres.com
ASX:MRZ
@MontRoyalRes
Linkedin.com/Company/mont-royal-resources
Subscribe for Investor Updates
Competent Person’s Statement
The information in this report that relates to exploration results is based on, and fairly represents,
information and supporting documentation prepared by Mr Hugues Longuépée, who is a Member
of the Ordre des Géologues du Québec. Mr Longuépée is a consultant to the Company. Mr
Longuépée has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity that is being undertaken to qualify as a Competent
Person as defined in the JORC Code 2012. Mr Longuépée does not hold securities in Mont Royal
Resources Limited and consents to the inclusion in the report of the matters based on the
information in the form and context in which they appear.
Cautionary Statement – Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation.
The Company draws attention to uncertainty in reporting visual results. Visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant
to valuations.
Forward-looking statement
Various statements in this announcement constitute statements relating to intentions, future acts
and events. Such statements are generally classified as “forward looking statements” and involve
known and unknown risks, uncertainties and other important factors that could cause those future
acts, events and circumstances to differ materially from what is presented or implicitly portrayed
herein. The Company gives no assurances that the anticipated results, performance or
achievements expressed or implied in these forward-looking statements will be achieved.
ASX:MRZ
Appendix 1 – Drill Collar Positions, Visual Estimates Table and Mineralised Intercepts
Drillhole_id
BOH-24-00
BOH-24-01
BOH-24-02
BOH-24-03
BOH-24-04
BOH-24-05
BOH-24-06
BOH-24-07
BOH-24-08
Azimuth
145
145
145
145
145
145
325
325
145
Dip
-45
-50
-45
-45
-45
-45
-45
-85
-45
Length
9
150
57
63
66
201
45
87
75
Table 1. Drillhole collar location. UTM NAD83 (zone 18).
X
683051
683037
682906
682905
683060
682813
683083
683084
682727
Y
5807231
5807256
5807113
5807114
5807215
5807165
5807187
5807186
5806983
ASX:MRZ
APPENDIX A - JORC CODE, 2012 EDITION
Table 1 – JORC Code 2012 Edition
Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation
Sampling
techniques
•
•
•
•
Drilling
techniques
•
Drill sample
recovery
•
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
Quality of
assay data
and
laboratory
tests
•
•
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’). In
other cases, more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Commentary
•
•
Sampling to start in the upcoming
days
Intervals to be sampled were
determined by the visual identification
of pegmatite and limit of recognizable
geological units.
•
•
•
•
Core drilling
NQ size
Standard tube
Non-oriented core
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
•
•
Core recovery is 99.4%.
Core recovery was calculated by
measuring recovered core length over
3m intervals (tube length).
Only one interval has a recovery
below 80%.
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
•
Core was entirely logged on site.
Logging includes geological
description of both mineralization and
barren intervals, RQD determination
and recovery calculation.
Logging is considered as quantitative
as geological contacts are considered
to have <10cm of accuracy.
All core was photographed (dry and
wet) on site.
N/A
•
N/A
•
•
•
•
•
ASX:MRZ
Criteria JORC Code explanation
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Commentary
•
N/A
•
Drill collars were surveyed after
holes completion using a handheld
Garmin GPS and a Geode antenna,
which gives a 1m accuracy.
Downhole surveys were done every
30m using a Reflex EZ-Trac.
Hole location was done using the
UTM NAD83 (zone 18) geographic
reference system.
•
•
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing, and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
•
•
Spacing between drilling sections
was planned at 200m as it was an
exploration program along a
prospective km-long gravimetry
anomaly.
Final spacing was adjusted to
minimize environmental impact.
The spacing is considered adequate
for the type of deposit and because
the data are not used for resources
estimation.
•
•
•
Orientation
of data in
relation to
geological
structure
•
Sample
security
Audits or
reviews
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
The measures taken to ensure sample security.
•
The results of any audits or reviews of sampling
techniques and data.
•
•
Drill holes were oriented
perpendicular to the targeted
geological unit.
Drill hole dip was set to reach
targeted depth and to hit the
pegmatite at the highest angle
possible.
N/A
•
N/A
•
•
Section 2 Reporting of Exploration Results (Criteria listed in the preceding
section also apply to this section)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
Commentary
•
•
•
Exploration
done by other
parties
•
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
•
•
•
The claims on which the drilling was
done are owned by Mont-Royal
Resources.
The claims are in good standing.
There are no impediments in regard
to environment or first nations rights
This was the first drill program for
lithium on the property.
ASX:MRZ
Criteria
JORC Code explanation
Commentary
Drilling and trenching was done in
the 1990’s for gold, in an area more
than 5km away from the drilling
presented herein.
• The property is generally
underexplored.
• The Upper Eastmain Greenstone belt
is an Archean Greenstone Belt part of
the Opatica Subprovince.
• The Bohier occurrence is
spodumene-rich LCT pegmatite
hosted by basalt.
• The information is provided in tables
and figures in the press release.
• Elevation is defined by the collar
position on 1:50,000 topographic
map. Its accuracy is therefore in the 2
meters range.
•
Geology
•
Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
•
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in meters) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report,
the Competent Person should clearly explain why this is
the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
•
•
Diagrams
•
Balanced
reporting
•
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
•
N/A
•
Angle to core axis in BOH-24-02 is 60
degrees, which suggest a true with of
9.5m.
Angle to core axis in BH-24-03 is 70
degrees, which suggests a true width
of 11m.
Width and angle to core axis from
hole BOH-24-06 and BOH-24-07
suggest folding. A true width of 13m is
estimated from surface exposure and
3D interpretation.
•
•
•
•
•
Provided in the text.
N/A
ASX:MRZ
Criteria
JORC Code explanation
Other
substantive
exploration
data
•
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
•
N/A
Further work
•
The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
•
More drilling is required to validate
extensions and will be planned
according to the 3D model.
Three (3) gravimetric lows are still
untested.
•
Commentary
•
Share your feedback
Discover