Ashram Rare Earths Project, Canada:
Waking a Sleeping Giant
PDAC Presentation March 2026
Mont Royal Resources Limited (ASX: MRZ / TSXV: MRZL)
2
Mont
Royal
Resources
Limited
Forward looking statements
This presentation contains certain “forward looking statements” within the meaning of Australian securities laws and “forward looking information” within the meaning of Canadian securities laws (collectively referred to as forward looking statements). All statements, other than statements of historical fact,
that address circumstances, events, activities or developments that could, or may or will occur are forward looking statements. Forward looking statements involve subjective judgment and analysis and are subject to significant uncertainties, risks and contingencies including those risk factors associated with
the mining industry, many of which are outside the control of, change without notice, and may be unknown to Mont Royal or Commerce. These risks and uncertainties include but are not limited to liabilities inherent in mine development and production, geological, mining and processing technical problems,
the inability to obtain any additional mine licences, permits and other regulatory approvals required in connection with mining and third party processing operations, competition for amongst other things, capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the
value of acquisitions, changes in commodity prices and exchange rates, currency and interest fluctuations, various events which could disrupt operations and/or the transportation of mineral products, including labour stoppages and severe weather conditions, the demand for and availability of
transportation services, the ability to secure adequate financing and management’s ability to anticipate and manage the foregoing factors and risks.
Forward looking statements in this announcement include, but are not limited to, statements regarding: the expected timetable, outcome and effects of the Transaction; the anticipated benefits of the Transaction to Mont Royal’s and Commerce’s shareholders; the prospects and outcomes of Mont Royal’s and
Commerce’s assets; the ability of Mont Royal and Commerce to complete the Transaction on the terms described herein or at all; the plans and strategies of Mont Royal or Commerce; the future performance of Mont Royal or Commerce; the ability to obtain the requisite regulatory, stock exchange, court and
shareholder approvals for the Transaction; and statements about market and industry trends, which are based on interpretation of market conditions. Forward looking statements can generally be identified by the use of forward looking words such as “anticipate”, “expect”, “likely”, “propose”, “will”, “intend”,
“should”, “could”, “may”, “believe”, “forecast”, “estimate”, “target”, “outlook”, “guidance” (including negative or grammatical variations) and other similar expressions. No representation, warranty, guarantee or assurance, express or implied, is given or made in relation to any forward looking statement. In
particular no representation, warranty or assumption, express or implied, is given in relation to any underlying assumption or that any forward looking statement will be achieved. There can be no assurance that the forward looking statements will prove to be accurate. Actual and future events may vary
materially from the forward looking statements and the assumptions on which the forward looking statements were based, because events and actual circumstances frequently do not occur as forecast and future results are subject to known and unknown risks such as changes in market conditions and
regulations. Estimates involve risks and uncertainties and are subject to change based on various factors, including the risk factors as set out on slides 33 to 36 of this presentation.
Given these uncertainties, readers are cautioned not to place undue reliance on such forward looking statements, and should rely on their own independent enquiries, investigations and advice regarding information contained in this presentation. Any reliance by a reader on the information contained in this
presentation is wholly at the reader’s own risk.
To the maximum extent permitted by law or any relevant listing rules of the ASX/TSX-V, Mont Royal and Commerce and their respective related bodies corporate and affiliates and their respective directors, officers, employees, advisors, agents and intermediaries disclaim any obligation or undertaking to
disseminate any updates or revisions to the information in this announcement to reflect any change in expectations in relation to any forward looking statements or any such change in events, conditions or circumstances on which any such statements were based. Nothing in this presentation will, under any
circumstances (including by reason of this presentation remaining available and not being superseded or replaced by any other presentation or publication with respect to Mont Royal, Commerce or the subject matter of this presentation), create an implication that there has been no change in the affairs of
Mont Royal or Commerce since the date of this presentation.
Forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company and the Directors and management of the Company, that could cause actual results,
performance, events or outcomes to differ materially from the results, performance, events or outcomes expressed or anticipated in these statements. Forward-looking statements should therefore be read in conjunction with, and are qualified by the risk factors as set out on slides 33 to 36 of this
presentation,.
This presentation uses market data, industry forecasts, and projections. The Company has obtained significant portions of this information from market research prepared by third parties. There is no assurance that any of the forecasts contained in the reports, surveys and research of such third parties that
are referred to in this presentation will be achieved. The Company has not independently verified this information.
Competent Persons
This presentation includes information on Mineral Resources for the Ashram Rare Earth Elements and Fluorspar Deposit, Nunavik, Quebec, Canada (Ashram Project). The statement of Mineral Resources presented in this presentation have been produced in accordance with Listing Rules Chapter 5 and the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves (JORC Code), with these statements reflecting information compiled and conclusions produced in the Ashram Mineral Resource Independent Technical Report with an effective date of 4 April 2024 in
accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards, and Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) by Commerce’s nominated Competent/Qualified Persons, being Patrik T Schmidt at Dahrouge Geological
Consulting Ltd, Pierre-Luc Richard (Mineral Resource estimate consultant) at consulting firm PLR Resources Inv for the Mineral Resource at the Ashram Project, Jeffrey Cassof (Senior Mining Engineer) at consulting firm BBA Inc, Tommee Larochelle (Principal Engineer (Processing)) at consulting firm L3 Proccess
Development, and Jordan Zampini (Senior Process Engineer) at consulting firm DRA Global Limited.
The above persons are all members of equivalent recognised overseas professional organisation and each have sufficient experience that is relevant to the style of mineralisation, the type of deposit under consideration, and the activity being undertaken to qualify as a Competent Person, as defined by the
JORC Code.
The Company’s mineral resource estimate and exploration information was first announced in its prospectus dated 17 September 2025 (Prospectus). The Company confirms that it is not aware of any new information or data that materially affects the information in the Prospectus and the material assumptions
and technical parameters supporting the mineral resource estimate continue to apply and have not materially changed.
So far as the Company is aware, the Competent Persons do not have any interest, including conflicting ones, that would be material to the information provided.
Resource estimates
Mineral Resource estimates are expressions of judgment based on drilling results, past experience with mining properties, knowledge, experience, industry practice and many other factors. Estimates which are valid when made may change substantially when new information becomes available. Mineral
Resource estimation is an interpretive process based on available data and interpretations and thus estimations may prove to be inaccurate.
The actual quality and characteristics of ore deposits cannot be known until mining takes place and will almost always differ from the assumptions used to develop resources.
Important Notice and Disclaimers
3
Mont
Royal
Resources
Limited
Key Value Drivers
Key ingredients in place to create rapid shareholder value
Ashram Rare Earths Project
• Large resource, Strong grades
• Strong metallurgy
• Clear development pathway
• Tier-1 location in Quebec, Canada
1
New Industry Leading Team
• New team with a strong track
record of value-creation
• Deep rare earths experience
• Canadian project funding &
development expertise
2
Strong Market Outlook
• REE demand has tripled in past
decade
• Robust demand outlook
• Potential major new Western
supply source
3
Strong Government Support
• Ideal timing with Canada’s
critical minerals drive
• Government funding
• Fast-track permitting
• Road access discussions
underway
4
Clear Development Strategy
• Updated PEA in progress
• Significant development
optionality
• Potential for staged
development approach
5
Robust Balance Sheet
• Strong cash position of A$7m
• Dual listing on ASX and TSXV
provides strong capital access,
liquidity and investor reach
6
4
Mont
Royal
Resources
Limited
Strategic Assets
Advanced Ashram REE & Fluorspar Project
Earlier stage Eldor Niobium Project and the
Northern Lights Gold-Copper-Lithium Project
All located in Québec – Tier-1 mining jurisdiction
Dual Listed
Dual-listed on the ASX and TSXV, with strong
capital access, liquidity and investor reach
Tier-1 Team & Shareholder Base
Senior management have held former and
current roles with successful international
resource groups including Champion Iron,
Hastings Technology Metals, Meteoric Resources,
Green Technology Metals, Primero Group,
Riversdale Resources and Bannerman Resources
– extensive REE and in-country experience
A Focused Critical
Minerals Company
Right time, right place, right team for
Canadian-focused rare earths developer
Ashram is the largest REE deposit in North America
5
Mont
Royal
Resources
Limited
Indigenous Communities
Mont Royal strives to maintain a transparent engagement process with our key
stakeholders
Inuits
Naskapi
Innus
Mont Royal has engaged
openly from an early stage with
all related First Nations
communities, - particularly as
part of the comparative access
road study.
A structured meeting schedule
is in place to ensure community
involvement at every stage of
the project.
Key
6
Mont
Royal
Resources
Limited
Mineral resources are not mineral reserves as they do not have demonstrated economic viability.
CaF2 is approximated from F (2.055 conversion factor) based on mineralogy.
The deposit has a high NdPr distribution of 21.2% NdPr (Indicated) and 21.4% NdPr (Inferred)1,
exceeding that of several active global producers.
Mineral resources are not mineral reserves as they do not have demonstrated economic viability.
CaF2 is approximated from F (2.055 conversion factor) based on mineralogy.
Ashram Deposit – REE and Fluorspar Resource
Tier-1 scale REE deposit with potential high-value by-products
1. Please refer to appendices.
7
Mont
Royal
Resources
Limited
• Bastnaesite, parisite and synchysite mineralogy
• Larger Grain Size than the A and B Zones – conducive
to flotation
• Improved heavy REE to light REE ratio
• Strong in-situ basket
• Heavy REE grades of up to 10.4% DyTb
• Light REE grades of up to 26.8% PrNd
• Potential to improve economics through reduced
stripping ratios and additional ore supply
BD Zone – A New Resource Story
Potential to add additional resource tonnes
Move into a scoping level
Metallurgical study
Next Steps
8
Mont
Royal
Resources
Limited
Metallurgical Testwork
Optimisation work on a robust flowsheet continues
Auralia Metallurgy
• No new testwork is being considered for the current PEA study
• New Flotation and Hydromet programmes to build on an already
robust flowsheet
• Flotation - 700Kg sample being prepared for flotation testwork to
build on and potentially further optimize current excellent
flotation results achieved by SGS Lakefield:
• Tails stream to be evaluated for Fluorspar concentrate
testwork – potentially back in Canada
• REE concentrate will be utilised for additional
Hydrometallurgical testwork and new innovative processing
pathways with technology partners
• Hydromet - testwork to be undertaken in Australia for both MREO
and MREC products
• MREO and MREC produced will be utilised for separation
testwork with potential technology partners
Technology Partners
9
Mont
Royal
Resources
Limited
Mining Beneficiation Hydromet
Oxide
Separation RE Metals RE Alloys
Permanent
Magnets
Future JV or Collaboration with 3rd Parties
1 2 3 4 5 6 7
Conventional Hard-
Rock mining process
Multi generational ore
body with very low
strip ratio.
~1.7Mtpa @ 1.9% TREO
feed grade
60 - 70% Recovery
producing ≥30%TREO
flotation concentrate.
~70kt Monazite
concentrate
95% LREE and 82% HRRE
Recoveries form high
purity MREC with
industry accepted
Radionuclide content
Final use
applications
Mixed Rear Earth
Carbonates
dissolved and
separated into
individual oxides
Separated
oxides
converted into
RE metals
Rare earth
metals turned
into alloys for
specific end use
applications
Upstream Downstream
Mont Royal will focus on the first three steps
Steps 4 and beyond will be industry partnerships and JVs
Ashram REE Value Chain
A staged, lower-risk approach to development in the REE Supply Chain
Current focus
10
Mont
Royal
Resources
Limited
Engineering Partners
Engineering
PEA Study is well progressed
Altris Engineering appointed Engineering lead on PEA restart
• Key changes to project Process Design Criteria now include:
• Southern access route to Schefferville now defined – increases
operability reduces capex
• Dislocation of Hydromet plant from site and relocation to a
Government supported southern Infrastructure hub - reduces
CAPEX and technical risk
• Reduction in daily throughput from 3mtpa to 1.7Mtpa – now
producing ~60ktpa Monazite concentrate from site
• PEA study due to be tabled in 1H 2026
• PFS study due to commence 2H 2026
11
Mont
Royal
Resources
Limited
Long Mine Life
PEA 30 Year Pit Shell is only the beginning..
Robust mining metrics
PH3 shown equates to 30 years of mine feed
to the Flotation plant feed or 25% of the
resource tonnage only.
PH3 is 53Mt plant feed @1.88% TREO
Strip Ratio of 0.3:1, provides strong economics
and much lower mining risk profile
12
Mont
Royal
Resources
Limited
Road Access
Southern Access Route Preferred
• Study completed by BBA and Nuna Resources
with input from First Nations groups and the
Provincial Government
• ~300km Southern Access Route to Schefferville
preferred by MRZ, First Nations and MRZ
• Will allow all year-round access to Ashram –
significantly de-risking the project
• Not planned as MRZ infrastructure but owned by
Government and First Nations groups
• Connect to Schefferville Rail spur and connects
through to the Port of Sept-Illes
• NRCan CMIF conditional grant of $2.6M awarded
to support further road studies
13
Mont
Royal
Resources
Limited
Port of Saguenay
A Future Critical Minerals Processing Hub
• MoU recently signed with Port Authority
• Saguenay Industrial complex offers deepwater
port container facilities
• Close to City of Saguenay - Population 170k
• Good ecosystem of skilled workers and support
services
• Access to processing facility via port, rail or road
• Industrial site reticulated with power, water and
gas and permitted discharge points
14
Mont
Royal
Resources
Limited
Development Strategy
Unlocking a globally significant rare earths asset
Progress Studies and
Deliver the REE Project
• Monazite concentrate @ 31% TREO for
offtake or Hydromet feedstock
• Staged development of the REE Project
• Develop Hydromet options
• Work with Provincial and Federal
Government to secure infrastructure
support
Unlock Value from
other Commodities
Fluorspar and Niobium
• World’s second largest fluorspar
deposit (4.5% fluorspar in REE ore feed)
• Additional flotation circuit can be
added to existing flowsheet to produce
a second, value-adding fluorspar
product
• Eldor Niobium Project adjacent to
Ashram
• Northern Lights Project offers potential
for lithium, copper and gold
Diversify Downstream
Collaborate and JV with industry to
capture additional value along the
REO and magnet supply chain
• Progress opportunities to participate
further down the value chain with North
American, European and Asian
industries
• Separation – either onsite to produce a
refined MREO product for separators or
JV and collaboration in new facilities
• Metalisation - the production of REE
metals and alloys through either JV or
collaboration
• Magnets – participate with industry
and manufacturers in producing
magnetic block or finished products
• Pursue alternative processing options
to Hydromet with emerging technology
providers
15
Mont
Royal
Resources
Limited
Priorities With a Development Focus
• PEA internal review ongoing – re-launch and
complete PEA Study with a staged approach
• Commence environmental baseline studies
following PEA completion
• Build out Development Team positions
• Commence Pre-Feasibility Study
• Continued collaboration and engagement with
stakeholders in the region
• Continue to develop offtake and downstream
opportunities with industry
• Continue to work closely with Quebec and Federal
Governments to secure road access commitment
for the Ashram Project
Ashram Project – Development Gaining Momentum
Strong platform for growth with multiple upcoming catalysts
16
Mont
Royal
Resources
Limited
Financial Data
Trading Code ASX:MRZ TSXV:MRZL
Share Price $0.22 (25/02/2026)
Shares on Issue 191.4m
Market Capitalisation $43m
Board and Management
Non-Executive Chairman Cameron Henry
Managing Director Nicholas Holthouse
Non-Executive Director Ronnie Beevor
Non-Executive Durector Jeremy Robinson
Non-Executive Director Adam Ritchie
VP Government Affairs Cindy Valence
Head Corporate Development Peter Ruse
Corporate Overview
1. Share price based on the closing share price as at 27th
February 2026
2. The Mont Royal is due to receive up to C$2.6m (A$2.86m) exploration tax rebate for
FY2025 which will add to existing cash treasury of $7m
With an Enterprise Value of approximately
A$35m, Mont Royal offers a compelling
insitu EV/TREO ratio of A$0.01 per Kg
compared to an insitu basket value of $24
– the lowest in the ASX peer group.
Mont Royal Resources Limited
ASX:MRZ
TSXV:MRZL
Nick Holthouse
Managing Director
Peter Ruse
Corporate Development
Contact: info@montroyralres.com
Nicholas Read
Investor and Media Relations
nicholas@readcorporate.com.au
APPENDICES
19
Mont
Royal
Resources
Limited
Notes to Mineral Resource Table: Originally reported under CIM/NI 43-101.
1. Mineral Resources are not Mineral Reserves as they have not demonstrated economic viability. The quantity and grade of reported Inferred Resources in this MRE are uncertain
in nature and there has been insufficient exploration to define these Inferred Resources as Indicated or Measured. However, it is reasonably expected that the majority of
Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
2. Resources are presented as undiluted and in-situ for an open-pit scenario and are considered to have reasonable prospects for eventual economic extraction. The
constraining pit shell was developed using an overall pit slope of 52°, and the resulting strip ratio is 2.7:1.
3. Three-dimensional modelling was prepared using Leapfrog Geo v.2023.2.1 with a database of 213 surface drill holes, 6 surface channels and 32,962 samples, of which 117 drill
holes and a total of 18,495 assays were used to interpolate the block model mineralised zones.
4. Resources encompass three REE-bearing zones (A-zone, B-Zone, and Breccia (Classic)), each defined by wireframes. A value of zero grade was applied in cases of core not
assayed.
5. High-grade capping was done on the composited assay data and established on a per-zone basis for each element.
6. Density values were interpolated using ordinary kriging for four rock types in the geological model, including the three mineralised rock types (A-Zone, B-Zones and Breccia
(Classic)), with density averages of 3.08 g/cm3 for A-Zone, 3.00 g/cm3 for B-Zone, 3.05 g/cm3 for Breccia (Classic), and 2.92 g/cm3 for BD-Zone. Surrounding country rock
lithologies were given a fixed density value from their range median values: Carbonatites ranging from 2.85 g/cm3 to 2.97 g/cm3, Metavolcanic = 2.84 g/cm3, and
Lamprophyre = 2.97 g/cm3. Grade model resource estimation was interpolated from drill hole data using an ordinary kriging interpolation method in a sub-blocked block
model using blocks measuring 5 m x 5 m x 5 m in size and sub-blocks down to 1.25 m x 1.25 m x 1.25 m.
7. The Mineral Resource estimate zero-return cut-off, expressed as a net metal return value, was calculated to be C$154/t, which is based on a three-year annualised average
(2021, 2022 and 2023) for the five payable oxides; (US$1.25/kg for La2O3, US$95/kg for Pr2O3, US$95/kg for Nd2O3, US$1,500/kg for Tb2O3, and US$375/kg for Dy2O3), estimated
metal recoveries, and operating costs for mining, processing, transportation and G&A. The Mineral Resource reporting cut-off of C$287/t was considered as the base case for
the Mineral Resource estimate and is guided by reasonable prospects of eventual economic extraction over a reasonable timeframe. The cut-off grade considers a C$:US$
exchange rate of 1.30. Metal prices sourced from Adamas Intelligence’s Rare Earth Pricing Quarterly Outlook (Q1 2024).
8. Inferred Mineral Resources are constrained to areas where drill spacing is less than 200 m, and where reasonable geological and grade continuity is shown. Indicated Mineral
Resources are constrained to areas where drill spacing is less than 70 m, and where reasonable geological and grade continuity is displayed
9. An open pit mining method was considered for the Mineral Resource estimate and a conceptual pit shell to constrain the resources was developed using Hexagon’s MinePlan
3D software, Version 16.05.
10. TREO is the sum of lanthanides (as oxides) + yttrium oxide. NdPr distribution is calculated as (Nd2O3 + Pr2O3) / TREO x 100. TbDy distribution calculated as (Tb2O3 + Dy2O3) /
TREO x 100. CaF2 is calculated from fluorine assay using factor of 2.055 (F to CaF2) and assumes all fluorine is contained within the mineral fluorite (‘fluorspar’).
11. Calculations used metric units (metres, tonnes). Metric tonnages have been rounded, and any discrepancies in total amounts are due to rounding errors.
12. CIM definitions and guidelines (2019) for Mineral Resource Estimates have been followed.
13. The Qualified Persons are unaware of any known environmental, permitting, legal, title-related, taxation, socio-political or marketing issues or any other relevant issues that
could materially affect this Mineral Resource estimate.