Ashram Project
Investor Presentation | June 2026
Mont Royal Resources Limited
ASX: MRZ TSXV: MRZL
Preliminary Economic Assessment Study
A globally strategic, long life rare earths project
2
Mont
Royal
Resources
Limited
Cautionary Statement – Preliminary Economic Assessment
The updated Preliminary Economic Assessment ("PEA") referred to in this presentation is a preliminary technical and economic study of the potential viability of the Ashram Rare Earth & Fluorspar Project ("Ashram" or the "Project"). The PEA is based on low-level technical and economic assessments and
has been completed to a level of accuracy of ± 50%. It is not sufficient to support the estimation of Ore Reserves or to provide assurance of an economic development case at this stage, nor to provide certainty that the conclusions of the PEA will be realised. Further exploration, technical, and economic
studies are required before Mont Royal Resources Limited ("Mont Royal" or the "Company") will be in a position to estimate any Ore Reserves or to provide assurance of an economic development case.
Production Target and Mineral Resources
The production target referenced in this presentation is underpinned by approximately 53 Mt of mill feed over a 30-year initial mine life. Of that mill feed, approximately 93% is sourced from Indicated Mineral Resources and approximately 7% from Inferred Mineral Resources. There is a low level of
geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the conversion of Inferred to Indicated Mineral Resources, or that the production target itself will be realised. The mine plan has been sequenced such that Indicated
Mineral Resources predominate in the early years of production, with Inferred Mineral Resources weighted towards the later stages of the mine life. The Company is satisfied that the proportion of Inferred Mineral Resources is not the determining factor in project viability. Mineral Resources are not
Mineral Reserves and do not have demonstrated economic viability.
Funding
To achieve the range of outcomes indicated in the PEA, initial capital funding in the order of CAD$1.23 billion (excluding access road, including 30% contingency) will likely be required. There is no certainty that Mont Royal will be able to raise that amount of funding when needed, or that funding will be
available on terms that are not dilutive to, or that do not otherwise affect, the value of Mont Royal's existing shares. Mont Royal may pursue other value realisation strategies, including a sale, partial sale, or joint venture of the Project, any of which could materially reduce Mont Royal's proportionate
ownership of the Project.
Forward Looking Statements
This presentation contains certain "forward looking statements" within the meaning of Australian securities laws and "forward looking information" within the meaning of Canadian securities laws (collectively, forward looking statements). All statements, other than statements of historical fact, that
address circumstances, events, activities or developments that could, may or will occur are forward looking statements. Forward looking statements in this presentation include, but are not limited to, statements regarding: the outcomes, economic metrics, production profile, capital and operating cost
estimates, mine life, payback period, NPV, IRR, EBITDA and revenue projections of the PEA; expected commencement and outcomes of the Pre-Feasibility Study (targeted for H2 CY2026); the timing and outcomes of permitting, environmental baseline studies and stakeholder engagement; the availability
and terms of project funding, including potential refundable Clean Technology Manufacturing Investment Tax Credits of approximately CAD$342 million incorporated into post-tax cash flows; opportunities relating to fluorspar, niobium, the BD-Zone and downstream value-chain participation; potential
government, First Nations and third-party support for road and shared-infrastructure solutions; offtake, joint venture and strategic partnership opportunities; and statements about market and industry trends including rare earth pricing assumptions based on Adamas Intelligence's Rare Earth Pricing
Quarterly Outlook (forecast prices applied 2026–2040, with 2040 pricing carried forward).
Forward looking statements involve subjective judgement and analysis and are subject to significant uncertainties, risks, contingencies and assumptions, many of which are outside the control of Mont Royal. These include risks inherent in mine development and production; geological, mining,
metallurgical and processing technical risks; the ability to obtain licences, permits and regulatory, stock exchange, court and stakeholder approvals; competition for capital, reserves, undeveloped lands and skilled personnel; changes in commodity prices (including rare earth oxide, NdPr, DyTb, Yttrium and
fluorspar prices), foreign exchange rates and interest rates; events that may disrupt operations or the transportation of mineral products; availability of transportation, power, water and other infrastructure; the ability to secure adequate financing on acceptable terms; and management's ability to
anticipate and manage the foregoing factors and risks. Forward looking statements can generally be identified by the use of words such as "anticipate", "expect", "likely", "propose", "will", "intend", "should", "could", "may", "believe", "forecast", "estimate", "target", "outlook" and "guidance" (including
negative or grammatical variations) and other similar expressions.
No representation, warranty, guarantee or assurance, express or implied, is given in relation to any forward looking statement or any underlying assumption. There can be no assurance that forward looking statements will prove accurate, and actual results may differ materially. Readers are cautioned not
to place undue reliance on forward looking statements and should rely on their own independent enquiries, investigations and advice. Reliance on the information in this presentation is wholly at the reader's own risk. To the maximum extent permitted by law and the listing rules of the ASX and TSX-V,
Mont Royal and its related bodies corporate, affiliates, directors, officers, employees, advisers and agents disclaim any obligation to update or revise any forward-looking statement to reflect any change in expectations or in the events, conditions or circumstances on which any such statement is based.
Market and Third-Party Data
This presentation uses market data, industry forecasts and projections, including rare earth pricing assumptions sourced from Adamas Intelligence and basket pricing benchmarks for CIF Europe and FoB China as at the dates indicated on the relevant slides. There is no assurance that any forecast contained
in third-party reports referred to in this presentation will be achieved. The Company has not independently verified this information.
Competent and Qualified Persons
The production target referred to in this presentation was first reported by the Company on 9 June 2026. The Company confirms that all material assumptions underpinning the production target and forecast financial information derived from the production target in the original announcement continue
to apply and have not materially changed.
Exploration results from Ashram referred to in this presentation were first reported in accordance with Listing Rule 5.7 by the Company on 30 September 2025 and 1 October 2025. Exploration results from the Eldor Niobium Project referred to in this presentation were first reported in accordance with
Listing Rule 5.7 by the Company on 26 May 2026. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements.
The Mineral Resource Estimate for Ashram was first reported in in the Company’s replacement prospectus dated 30 September 2025 and released to ASX on 1 October 2025 (Prospectus). The Company confirms that it is not aware of any new information or data that materially affects the information
relating to the estimate included in the Prospectus and that all material assumptions and technical parameters underpinning the estimate in the Prospectus continue to apply and have not materially changed.
Resource Estimates
Mineral Resource estimates are expressions of judgement based on drilling results, geological interpretation, industry practice and other factors. Estimates that are valid when made may change substantially when new information becomes available. Mineral Resource estimation is an interpretive process
and estimates may prove to be inaccurate. The actual quality and characteristics of ore deposits cannot be known until mining takes place and will almost always differ from the assumptions used to develop the estimate.
Risk factors associated with the Project, the Company and an investment in the Company are set out on slides 47 to 50 of this presentation, and forward-looking statements should be read in conjunction with, and are qualified by, those risk factors.
Important Notice and Disclaimers
ASHRAM PROJECT –
UPDATED PRELIMINARY
ECONOMIC ASSESSMENT
“The updated PEA marks a major step forward for the Ashram Project, confirming a large-scale, long-life
development with strong underlying economics and a clear pathway to advancement. The study has
highlighted Ashram’s combination of scale, favourable mineralogy and competitive cost profile, supporting its
potential to become a meaningful long-term supplier of rare earth products into Western supply chains.
Importantly, we see further upside beyond the base case, including opportunities in fluorspar, resource
expansion and downstream partnerships and collaboration.
This is a project that can have a meaningful and long-lived impact on the development of rare earth industries
and technologies within Quebec, Canada, North America and Europe.
Our focus now is continuing to work with First Nations and Government agencies on developing infrastructures
strategies and on progressing the project into pre-feasibility, advancing permitting and continuing engagement
with strategic and offtake partners.”
Mont Royal’s Managing Director, Nicholas Holthouse:
4
Mont
Royal
Resources
Limited
Investment Highlights
Ashram is well placed to be a long-life, scalable supplier of REE elements
One of the largest monazite-
mineralised carbonatite-hosted
REE projects in North America with
204.3Mt @ 1.90% TREO
Remains open at depth
Government support
Strong Canadian and Quebec
Government support for new critical
minerals projects, including financial
assistance, strategic policy backing
and streamlined permitting pathways
~17.5kt p/a of TREO
in an MREC concentrate
~4,035 tonnes of NdPr/pa
~100 tonnes DyTb/pa
NPV8 of ~$2.03B CAD Post-Tax
AISC of ~C$18/Kg of saleable TREO
provides significant margin against
average basket price of $48.30/Kg
Initial CAPEX of CAD
~$1.23B inclusive of 30% contingency
Stage 1 mine life of 30 years – utilizing
25% of the current available resource
Scalable to meet industry demands
Multi-element resource portfolio
• Rare Earth Elements
• Fluorspar
• Niobium (Pre-Resource)
5
Mont
Royal
Resources
Limited
Ashram PEA Overview
Potential for a long-life, strategically important critical minerals supply hub
Strong economics
• Post-tax NPV8% (real):
~C$2.03B
• Post-tax IRR (real):
~22.0%
• CTM ITC tax credit of
~C$342M
• LOM Revenue of
~$24.6B
• EBITDA CAD $15.46B
(~62.7%)
• PEA completed by Altris
Engineering, BBA, PLR,
DRA, L3, ASDR Canada,
TALA Geotec, Norda
Stelo
Globally significant
• Mine life: ~30 years
• Average REO
production: ~17,466tpa
• Average NdPr
production: ~4,035tpa
• PEA based on 53Mt of
resource feed, just 25%
of the current MRE
Industry standard mining
and processing
• Conventional open-pit,
truck-and-shovel
operation
• On-site concentrator
• Hydromet processing in
Saguenay
• Low development risk
and strong scalability
Upside Opportunities
• Optimisation of
hydromet process
• Inclusion of dedicated
fluorspar circuit
• Inclusion of higher-
value zones – BD-Zone
• Downstream and
strategic partnership
opportunities
• Resource growth
Next Steps
• PFS targeted to
commence 2H CY2026
• Metallurgical
optimisation and
engineering studies
• Environmental studies
and permitting
6
Mont
Royal
Resources
Limited
PEA Highlights
Compelling economics and physicals
Post Tax NPV8% (real)
~C$2.03B
Post-tax IRR (real)
~22.0%
Initial CAPEX
~C$1.23B
Including 30% contingency
C1 Cost Kg TREO
~C$17.99/kg
AISC Kg TREO
~C$18.58/kg
Av. Annual TREO Production
~17,466t
Mine Life
~30 years
LOM TREO Production
~510kt
Payback period
~3.9 years
7
Mont
Royal
Resources
Limited
The deposit has a high NdPr distribution of 21.2% NdPr (Indicated) and 21.4% NdPr (Inferred)1,
exceeding that of several active global producers.
Mineral resources are not mineral reserves as they do not have demonstrated economic viability.
CaF2 is approximated from F (2.055 conversion factor) based on mineralogy.
Ashram Deposit – REE and Fluorspar Resource
Tier-1 scale REE deposit with potential high-value by-products
1. Please refer to appendices.
8
Mont
Royal
Resources
Limited
Classification
Tonnes
(Mt)
TREO
(%)
Nd + Pr
oxide / TREO
Tb + Dy
oxide / TREO
Fluorspar
(%)
Measured - - - - -
Indicated 73.2 1.89 21.2 0.7 6.6
Inferred 131.1 1.91 21.4 0.5 4.0
Total 204.3 1.90 21.3 0.6 4.9
All Oxides
Unit Indicated Inferred
Tonnes Mt 73.2 131.1
Total TREO % 1.89 1.91
Nd+Pr Oxide/TREO % 21.2 21.4
Tb+Dy Oxide/TREO % 0.7 0.5
La2O3 ppm 4,829 4,969
Ce2O3 ppm 8,753 8,933
Pr2O3 ppm 907 927
Nd2O3 ppm 3,112 3,162
Sm2O3 ppm 412 385
Eu2O3 ppm 98 87
Gd2O3 ppm 223 195
Tb2O3 ppm 24 19
Dy2O3 ppm 102 73
Ho2O3 ppm 14 10
Er2O3 ppm 31 21
Tm2O3 ppm 3 2
Yb203 ppm 18 13
Lu2O3 ppm 2 2
Y2O3 ppm 419 280
Fluorspar (CaF2) % 6.6 4
Ashram Project Mineral Resource Statement (at 1st October 2025)
1. Please refer to appendices.
9
Mont
Royal
Resources
Limited
Mining
Simple open pit mining, low strip ratio
30-year mining schedule contains 93% Indicated
Resource tonnes
Utilises 25% of current resource
Low strip ratio of 0.4:1 (waste to ore)
Most waste required for tailings dam
construction, no large waste dump legacies
C$8.70/tonne
C$12.30/tonne ore feed
C$1.28/kg TREO
Averaged Mining Costs
10
Mont
Royal
Resources
Limited
Site Infrastructure
Supporting mine site
infrastructure includes:
Internal access roads
Diesel-based power generation
Telecommunications systems
Fuel storage
Explosives facilities
Administration buildings
Accommodation for up to 200 personnel
Aerodrome also planned, subject to further
studies and approvals
11
Mont
Royal
Resources
Limited
Flowsheet
Standard Hard Rock flowsheet
12
Mont
Royal
Resources
Limited
0%
5%
10%
15%
20%
25%
30%
35%
40%
0
10000
20000
30000
40000
50000
60000
70000
80000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Grade
Tonnes
Years
Concentrate Tonnes and Grade
Con TREO T Grade %
Ashram Concentrator
$67.89 Tonne Processed
Concentrator Metrics
1.7Mtpa processed through the Ashram flotation
circuit
1.8Mtpa on-site concentrator using conventional
crushing, grinding, flotation and dewatering
circuits:
• REO recovery from flotation of 63%
• Average annual production of 69,500t of
flotation concentrate grading ~30% TREO
$7.06/Kg TREO
$30.57/Kg NdPr
Concentrate Tonnes and Grade
13
Mont
Royal
Resources
Limited
Hydromet
Simple, low-risk development pathway
Hydromet processing in Saguenay:
• Proven process route
incorporating acid bake, water
leach, solvent extraction,
oxalate precipitation
• Average annual production of
33,800t of mixed rare earth
carbonate (MREC)
Future optionality for additional
downstream processing initiatives
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Tonnes
Years
Mixed Rare Earth Carbonate and Contained Total Rare Earth Oxides by Year
MREC @ 55% TREO TREO
17.7Kt Contained TREO - 4kt NdPr - 100t DyTb – 230t Y
Annually
Mixed Rare Earth Carbonate and Contained Total Rare Earth Oxides by Year
14
Mont
Royal
Resources
Limited
Mining Beneficiation Hydromet
Oxide
Separation
1 2 3 4
Conventional hard-
rock mining process.
Multi-generational
deposit with very low
strip ratio.
1.9% TREO feed grade.
60-70% recovery
producing ~30%TREO
flotation concentrate.
Potentially a stand-
alone saleable
product.
95% LREE and 82% HRRE
recoveries form high
purity MREC with
industry accepted
Radionuclide content.
Mixed Rare Earth
Carbonates
dissolved and
separated into
individual oxides.
Upstream Downstream
Low Strip Mining – Industry-standard Flotation and Hydromet
Three Process Steps to a Saleable MREC
Industry-standard hard rock processing flowsheet
Current focus
Technical
Partnerships
and JVs
preferred for
step 4 and
beyond
15
Mont
Royal
Resources
Limited
Detailed Project Metrics1
Parameter Unit Value
Production Profile
Construction period years 2
Production life years 30
Mill throughput (nameplate) Ktpa 1,788
Average head grade % TREO 1.88%
Overall TREO recovery % 51.3%
Annual saleable REO production tpa 17,466
Annual NdPr production tpa 4,035
LOM saleable REO t 510,000
Economic Results
LOM revenue C$M 24,637
LOM EBITDA C$M 15,460
LOM EBITDA margin % 62.7%
LOM undiscounted post-tax cashflow C$M 8,365
NPV 8% post-tax (real) C$M 2,026
NPV 8% pre-tax (real) C$M 3,440
IRR post-tax (real) % 22.0%
IRR pre-tax (real) % 25.6%
Payback from start of production (post-tax) years 3.9
Unit Costs
C1 cash cost C$/kg saleable REO 17.99
All-in sustaining cost (AISC) C$/kg saleable REO 18.58
1 Rare Earths pricing assumptions based on Adamas Intelligence’s Rare Earth Pricing Quarterly Outlook, with forecast prices applied for the period 2026–2040 and 2040 pricing
estimates carried forward for the remainder of the mine life due to the increasing uncertainty associated with long-term forecasts beyond that period.
16
Mont
Royal
Resources
Limited
Capex and Operating Costs
Capex supports long mine life, AISC underpins strong operating margins
Capex Unit Spot
Pre-production capital expenditure CAD$M 1,231
LOM sustaining capital expenditure CAD$ / year 9.97
Unit cash operating costs Unit Spot
Annual operating cost CAD$M 305
Annual operating cost CAD$/kg TREO 17.99
Annual AISC CAD$/kg TREO 18.58
Capex of CAD $1.2B
includes 30%
contingency
17
Mont
Royal
Resources
Limited
Capital Cost Expenditure
Area
Capital costs (C$M)
Initial Sustaining Closure Post-closure Total
Ashram Road1 - - - - -
Ashram Mine 18.2 16.6 - - 34.8
Ashram Concentrator 295.0 - - - 295.0
Ashram General NPI 191.5 - - - 191.5
Ashram Tailings Storage 22.7 209.7 - - 232.4
Ashram Tailings - Hydromet Cell 3.9 3.9 - - 7.7196
Ashram Site Water Management 14.7 - - - 14.7
Ashram Site Water Treatment 6.8 - - - 6.8
Saguenay Hydrometallurgical Refinery 357.5 - - - 357.5
Saguenay General NPI 32.3 - - - 32.3
Saguenay Site Water Treatment 4.5 - - - 4.5
Closure - - 50.6 6.5 57.1
Contingency (30%) 284.1 69.0 15.2 2.0 370.3
Total 1,231.2 299.1 65.8 8.5 1,604.5
1 Mont Royal is investigating
opportunities for the
Ashram Road CAPEX to be
supported by Provincial
and Federal Government
initiatives or a regional
shared infrastructure
strategy
18
Mont
Royal
Resources
Limited
Operating Cost Expenditure
Area
Per Avg Operating Year
(C$M, real)
C$/t ore
processed
C$/kg REO
LOM
(C$M, real)
Mining 21.72 12.29 1.28 651.51
Processing - Concentrator 119.96 67.89 7.06 3,598.70
Processing - Hydrometallurgy 71.65 40.55 4.21 2,149.40
General & Administrative 82.77 46.84 4.87 2,483.12
Tailings management 4.82 2.73 0.28 144.57
Owner’s cost 3.64 2.06 0.21 109.09
Waste Water Treatment 1.38 0.78 0.08 41.54
Total 305.93 173.13 18.00 9,177.93
Competitive projected operating cost profile
• C1 cash cost of approximately C$17.99/kg saleable REO
• AISC of approximately C$18.58/kg saleable REO
19
Mont
Royal
Resources
Limited
AISC
0
10
20
30
40
50
60
2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050 2051 2052 2053 2054 2055 2056 2057 2058 2059 2060
$CAD/Kg
TREO
Year
AISC $CAD/Kg TREO Recoverd TREO Basket$CAD/Kg (70% Payable)
Production Ramp up
Average AISC CAD$18.58/Kg TREO - Average Basket Price CAD$48.40
(70% Payability applied)
High
Margins
and
Profitability
High Post
Tax NPV
AISC v Recovered TREO/Kg
20
Mont
Royal
Resources
Limited
CAD 1.23B Capex – 3.9 Year Payback
Strong free cash-flow generation underpins rapid payback
(2,000)
-
2,000
4,000
6,000
8,000
10,000
-2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Cashflow
CAD
$B
Years
Project Free cash Flow (inc Tax) Cumulative FCF (RHS)
LOM Pricing
CAD$234*/kg NdPr avg.
LOM NPV
CAD$2.03B (post-tax)
Project Payback
Project Free Cashflow
CTM ITC Tax Credits
CAD$342M
21
Mont
Royal
Resources
Limited
Road Access
Southern Access Route Preferred
Study completed by BBA and Nuna Resources with
input from First Nations groups and the Provincial
Government
~300km Southern Access Route to Schefferville
preferred by MRZ, First Nations and Provincial
Government agencies
Will allow all year-round access to Ashram –
significantly de-risking the project
Not planned as MRZ infrastructure but owned by
Government and First Nations Groups
Connect to Schefferville Rail spur and connects
through to the Port of Sept-Illes
NRCan CMIF conditional grant of $2.6M awarded to
support further road studies*
* As announced on 26 February 2026
22
Mont
Royal
Resources
Limited
Environmental Work Program
& Upcoming Studies
To Be Completed for the Mine Site and Road Corridor
(As part of the PFS and the Environmental & Social Impact Assessment)
• Geochemical characterization of ore, waste rock, and tailings
• Noise level characterization
• Air quality characterization
• Soil quality characterization
• Hydrology characterization
• Surface water and sediment characterization
• Hydrogeology and groundwater characterization
• Vegetation and wetland characterization
• Fish habitat characterization
• Terrestrial wildlife characterization
• Avian wildlife characterization
• Demographics
• Employment
• Health
• Infrastructure
• Land use
• Archaeology
Socio-Economic Baseline Description
23
Mont
Royal
Resources
Limited
Ashram Deposit – Basket Value and Drivers
Europe CIF Index becoming a real China Pricing Alternative
Basket value driven by four magnet
metals – Pr, Nd, Dy and Tb along with
Yttrium
Same Basket - Two Markets:
CIF Europe
US$61.09/kg
(Spot CIF Europe 30/4/2026).
FoB China
US$29.24/kg
(Spot ExW China April 2026).
Basket Composition and Value
22% MREO (21.2% LREE and 0.8% HREE)
composition drives 93% of the value.
1% from Yttrium.
Based on China FoB price average April 2026
Significant gap building over the two
markets.
0
20
40
60
80
100
120
Basket
%
La2O3 CeO2 Pr6O11 Nd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 Sm2O3 Eu2O3 Gd2O3
MREO
22%
Basket Element
Value
93%
Value
Basket
Composition
24
Mont
Royal
Resources
Limited
Lynas Rare Earths Ltd
Arafura Resources
Hastings
Lindian Resources Ltd
Meteoric Resources
Viridis
ASM
USA Rare Earths
Pensana
Defense Metals
MP Materials Corp
Ashram
Vital Metals
0
1000
2000
3000
4000
5000
6000
7000
0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0%
In
situ
TREO
(Kt)
TREO Grade%
Ashram Project – Peer Comparison
Ashram TREO endowment sits amongst the best
One of the largest
undeveloped hard-rock REE
deposits globally (~204Mt)
Tier-1 jurisdiction: Québec,
Canada
30-year mine life
Aligned with Western supply
chain demands
Bubble size = Contained TREO (Mt)
White = Ionic Clay
Brown = Hard Rock
25
Mont
Royal
Resources
Limited
Development Strategy
Unlocking a globally significant rare earths asset
Commence PFS
• Monazite concentrate @ 30% TREO for
offtake or Hydromet feedstock
• Staged development of the REE Project
• Develop Hydromet options
• Work with First Nations, Provincial and
Federal Government to secure
infrastructure support
Unlock Value from
other Commodities
Fluorspar and Niobium
• World’s second largest fluorspar
deposit (4.5% fluorspar in REE ore feed)
• Additional flotation circuit can be
added to existing flowsheet to
potentially produce a second, value-
adding fluorspar product
• Eldor Niobium Project adjacent to
Ashram
• Northern Lights Project offers potential
for lithium, copper and gold
Diversify Downstream
Collaborate and JV with industry to
capture additional value along the
REO and magnet supply chain
• Progress opportunities to participate
further down the value chain with North
American, European and Asian
industries
• Separation – either onsite to produce a
refined MREO product for separators or
JV and collaboration in new facilities
• Metalisation - the production of REE
metals and alloys through either JV or
collaboration
• Magnets – participate with industry
and manufacturers in producing
magnetic block or finished products
• Pursue alternative processing options
to Hydromet with emerging technology
providers
26
Mont
Royal
Resources
Limited
Multiple Pathways to Enhance PEA Base-Case
Optimise hydromet processing
• Test work highlights clear optimisation opportunities to be advanced during Pre-Feasibility Study
Inclusion of fluorspar
• Globally significant fluorspar endowment within the current Ashram MRE
• United States and Canada are Net importers of Fluorspar - Ashram has genuine potential to service local markets
• Previous lab-scale test work has demonstrated ability to produce both Met and Acid grade fluorspar products
• Dedicated fluorspar circuit to be considered as part of future study workstreams
Mine Plan Extensions + Resource Growth
• PEA is based on only 25% of current MRE
• Potential to incorporate higher-value zones not currently included in the mine plan, including the BD-Zone
• Outstanding exploration upside at Ashram and surrounding properties
Downstream and strategic partnership opportunities
• Potential to produce value-added downstream products through JV’s or industry collaboration – eg rare earth metals,
alloys and permanent magnets
27
Mont
Royal
Resources
Limited
Next Steps
Pre-Feasibility Study targeted to commence in the second half of
2026
Continue to work closely with First Nations, Quebec and Federal
Governments to secure road infrastructure commitment for the
Ashram Project
Commence environmental baseline studies
Progress project permitting
Build out Development Team positions
Progress Fluorspar test work for possible PFS inclusion
Accelerate engagement around offtake and downstream
opportunities with industry
MONT ROYAL RESOURCES –
CORPORATE OVERVIEW
29
Mont
Royal
Resources
Limited
Jeremy Robinson
Non-Executive Director
▪ Experienced resources
executive with 20 years
in the industry,
specializing in critical
minerals, including rare
earths
▪ Principal and founder of
Churchill Strategic
Investments
Group, which has
financed multiple junior
explorers and
developers across the
ASX and TSX
▪ Non-Executive Director
of RareX ASX:REE
Ronnie Beevor
Non-Executive Director
▪ +40 years in investment
banking and mining
▪ Former Head of Investment
Banking at Rothschild
Australia
▪ Former Board member of
Atalaya Mining, Riversdale
Resources, Talison Lithium,
Bannerman Energy and
Oxiana
▪ Current Non-Executive
Director of Champion Iron
and Chairman of Felix Gold
and Peel Minerals
Cameron Henry
Non-Executive
Chairman
▪ Founding managing
director of EPC
engineering firm,
Primero Group
Limited
▪ Managing Director of
Green Technology
Metals ASX:GT1,
Former Non-Executive
Director at RareX
ASX: REE and
previously heavily
involved in the
development of the
Mt Weld Rare Earths
project for Lynas
Corporation ASX:LYC
Adam Ritchie
Non-Executive Director
▪ Over 20 years of
experience in the
resources industry
▪ Extensive background in
project delivery in senior
roles at top Australian
mining and minerals
companies, including
Pilbara Minerals, FMG,
Rio Tinto, and BHP
▪ Currently serving as
Managing Director of
ASX-listed Loyal Metals
Limited
Board and Leadership Team
A team with proven track record of delivering major projects
Nicholas Holthouse
Managing Director
▪ 36 years in mining
leadership, with global
experience across
operations, projects, and
corporate roles
▪ Rare earths expertise as
CEO of Meteoric ASX:MEI
(Caldeira Project, Brazil)
and COO of Hastings
ASX:HAS (Yangibana
Project, WA)
▪ Current Non-Executive
Director of Brazilian
Critical Minerals
ASX:BCM
Senior Management
Constantine
Karayannopoulos
Strategic Advisory Board
Pete Ruse
Business
Development
Cindy Valence
Government Relations
Gavin Beer
Technical Advisor
Darren L. Smith
Technical
Advisor
Advisory Board
30
Mont
Royal
Resources
Limited
Strategic Assets
Advanced Ashram REE & Fluorspar Project
Earlier-stage Eldor Niobium Project and Northern Lights Gold-
Copper-Lithium Project
All located in Québec – a Tier-1 mining jurisdiction
Dual Listed
Dual-listed on the ASX and TSX-V, with strong capital access,
liquidity and investor reach
Tier-1 Team & Shareholder Base
Senior management have held former and current roles with
successful international resource groups, including:
• Champion Iron, Hastings Technology Metals, Meteoric
Resources, Green Technology Metals, Primero Group,
Riversdale Resources and Bannerman Resources
• Extensive REE and in-country experience
A Focused Critical Minerals Company
Right time, right place, right team for Canadian-focused rare earths developer
31
Mont
Royal
Resources
Limited
Capital Structure
Shares on issue M 191.14
Share Price* A$ 0.22c
Market capitalisation A$M 42.05
Net cash (Pro Forma)** A$M 7.80
Enterprise value A$M 34.25
Options*** M 72.8
Performance rights/units M 12.26
Capital Structure
*ASX: MRZ Share price ($AUD) on 5 June 2026.
**Mont Royal understands that the the approximately C$2.3m exploration tax rebate for FY2025 will be received in June 2026
*** MRZ/MRZL Options on issue with various exercise prices
32
Mont
Royal
Resources
Limited
Indigenous Communities
Mont Royal strives to maintain a
Share your feedback
Discover